353 - 355 Goswell Road, London Data via plota.co.uk

P2024/3585/LBC - Listed Building VALIDATED

Proposal

Retrospective application in relation to the installation of 10 x AC units to the rear of 355 Goswell Road (Full Planning Application P2024/3584/FUL also submitted) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
29 Nov 2024
Decision
Target date was 5 Aug 2025

Under consideration

No decision has been issued yet. Plota predicted a decision around 12 Nov 2026; it is now day 713.

Site constraints 22

Article 4 directionCritical Drainage Group3_006CAZCentral Activities ZoneIslington LU Zones of InterestLocal Plan Strategic and Development Management Policies - Policy B1 DeliveringLocal Plan Strategic and Development Management Policies - Policy R10 Culture anAlexandra Palace viewing terrace to St Paul's CathedralNew RiverWithin 50m of New RiverWithin 50m ofII
Grade II listed: Numbers 353-355 (Odd) and Attached Railings
List entry 1292490 · 3 m away · 14 more listed buildings within 150 m (14 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 14 with distances
Historic England ↗
New River conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Protected view corridor: 1A.2 Alexandra Palace viewing terrace to St Paul's Cathedral
Inside the landmark viewing corridor of a protected vista. A building that rises above the corridor's threshold height should be refused. How high that is depends on where along the view the site is.
The London Plan (policy HC4) designates strategic views, and the Mayor's London View Management Framework (March 2012) gives 13 of them a protected vista toward St Paul's Cathedral, the Palace of Westminster or the Tower of London. A vista has a threshold height that rises or falls with the line of sight. In the landmark viewing corridor, a building above it would harm the view and should be refused. In the wider setting consultation area around the corridor, a building above it is referred for consultation and its effect on the view is judged. The threshold changes along each view and is set out in the framework. A revised framework is out for consultation until 4 December 2026 and is not yet in force.
London View Management Framework ↗
Air quality management area: Islington AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Angel
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
Article 4 directionCouncil record
Some permitted development rights are withdrawn. The direction is on the council's register but not published as open data.
Council site ↗
Critical Drainage Group3_006Council record
Recorded by the council for this site.
Council site ↗
CAZCouncil record
Recorded by the council for this site.
Council site ↗
Central Activities ZoneCouncil record
Recorded by the council for this site.
Council site ↗
Islington LU Zones of InterestCouncil record
Recorded by the council for this site.
Council site ↗
Local Plan Strategic and Development Management Policies - Policy B1 DeliveringCouncil record
Recorded by the council for this site.
Council site ↗
Local Plan Strategic and Development Management Policies - Policy R10 Culture anCouncil record
Recorded by the council for this site.
Council site ↗
Alexandra Palace viewing terrace to St Paul's CathedralCouncil record
Recorded by the council for this site.
Council site ↗
New RiverCouncil record
Recorded by the council for this site.
Council site ↗
Within 50m of New RiverCouncil record
Recorded by the council for this site.
Council site ↗
Within 50m ofCouncil record
Recorded by the council for this site.
Council site ↗
IICouncil record
Recorded by the council for this site.
Council site ↗
Also on the record
Heritage at risk 41 m away: Angel; National infrastructure project 1935 m away: Thames Tideway Tunnel; Inside the Islington built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 9 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area343 m² (3,692 sq ft)
Energy ratingD (asset rating 87)
UseB1 Offices and Workshop businesses
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in April 2019, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Islington - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Islington
Application type
Listed Building
Received
29 Nov 2024
Ward
St Peter's & Canalside
Case officer
Show
Target decision
5 Aug 2025
Applicant
Show
Agent
Aleksandar Pantazis

Decision outlook

Day 713, past the statutory target. 74% of listed building works in Islington are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 9 Nov 2026.

Day 713657 days past the 56-day target
50%decided within 8 weeks
94%approved
347decided in the last year

Plota live figures for listed building works decided by Islington in the last twelve months, from validation. Islington decision record →

Consultation & key dates

Alt. reference
PP-13582159_C
Islington
Planning Authority Score
2.9/10
Poor
#237 of 296 councils
Relevant to this application:
Other decisions

Islington is slower than most councils at deciding householder applications, ranking #260 out of 296. 53% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Islington decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #132 of 296
93%
Householder approved
Above avg (90%) #130 of 296
43%
Decided in 8 weeks
Below avg (63%) #260 of 296
53%
Extended time limit
Above avg (41%) #241 of 296
89%
Minor dwellings approved
499 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
89%
Change of use approved
19 decided
1,488
Total decisions
167 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.