STREET RECORD Nether Court Halstead Essex Data via plota.co.uk

26/01511/TPO Approved

Proposal

Application to carry out works to trees protected by Tree Preservation Order 12/2009 & 09/1984: 01J0 - Oak (Quercus rober) T1 of Ivy management - Cut through ivy stems around base. Sever, strip base to 2m and remove holly saplings at base on N side. Cut back from lamp post by 1.5m. Crown lift to 2.5m over the footpath. Crown lift over buildings to provide 2.5-3m vertical clearance along roof pitch cutting sub-laterals only. Remove stem epicormic adjacent to No.3 back from property to crown break. Crown lift lower dropper sub-laterals on SE side to parent branch overhanging No.3. Reason: Manage tree to its environment, improving light and minimising/reducing any nuisance to buildings, footpaths and lamp posts. 01FT - Group mixed species A2 of - cut back by 2m from side elevation of No.1 Bullfinch Drive and lamp post. 01FY - Group mixed species A2 of - Fell dead Elder on Eastern end of group. Cut back by 2m to side elevation of No.16. Fell two Prunus adjacent to garage of No.14. 01FU - Oak (Quercus rober) A2 of - cut back by 2m on western side elevation of property only, no works to lift above roof. Reason: Manage trees to their environment, improving light and minimising/reducing any nuisance to buildings and lamp posts. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
2 Jul 2026
✓
Approved
13 Oct 2026

Approved on 13 Oct 2026 · Last checked 20 Oct 2026

Planning committee

Decided by Braintree Planning Committee on 6 Oct 2026.

Approved

No officer report was published for this decision; this summary is from the committee minutes.

  • The application concerned works to trees protected by Tree Preservation Order 12/2009.
  • The application was associated with Braintree District Council at Halstead.
  • The committee approved the application.
Read how the committee decided The proposed tree works, application details and committee decision. Includes the meeting recording, from 0:35:24 where this application was taken

Source: Plota analysis of Braintree's committee minutes of 6 Oct 2026.

Site constraints 2

Also on the record
Inside the Halstead (Braintree) built-up area; Priority habitat 34 m away: Deciduous woodland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Braintree - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Braintree
Received
2 Jul 2026
Validated
2 Jul 2026
Target decision
27 Aug 2026
Decision
Application GRANTED
Decision date
13 Oct 2026

How this decision compares

Decided in 103 days from validation, 64 days slower than Braintree's median of 39 for tree and landscaping works. Approved, as 96% of tree and landscaping works here are.

89%decided within 8 weeks
96%approved
463decided in the last year

Plota live figures for tree and landscaping works decided by Braintree in the last twelve months, from validation. Braintree decision record →

Consultation & key dates

Comments by
27 Jul 2026
Statutory expiry
27 Aug 2026
Braintree
Planning Authority Score
7/10
Good
#61 of 296 overall
Relevant to this application:
Householder decisions

Braintree is faster than most councils at deciding householder applications: #47 of 296 on speed. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Braintree decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #189 of 296
92%
Householder approved
Above avg (90%) #148 of 296
78%
Decided in 8 weeks
Above avg (63%) #47 of 296
33%
Extended time limit
Below avg (41%) #71 of 296
62%
Minor dwellings approved
119 decided (1-9 homes)
87%
Major dwellings approved
15 decided (10+ homes)
91%
Change of use approved
11 decided
927
Total decisions
132 refused in the year to March 2026