Land to the Rear Of The Old Boathouse 16 Hurst Road East Molesey Surrey KT8 9AF Data via plota.co.uk

2025/2671 - Full Application Final Decision

Proposal

Change of Use of Agricultural Unit (Class R) to Residential dwelling (Class C3) and conversion to create a detached two-storey house with associated parking, cycle store and entrance gates. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
14 Oct 2025
✓
Validated
19 Dec 2025
Decision
Target date was 13 Feb 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 19 Nov 2026; it is now day 335.

Site constraints 7

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
East Molesey Kent Town conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
1 listed building within 150 m of the postcode pin
Nearest: War memorial to the men of East and West Molesey, Grade II, about 40 m from the postcode pin
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Historic England ↗
Also on the record
SSSI about 403 m away: Bushy Park and Home Park SSSI; Inside the West Molesey built-up area; Air quality management area about 53 m away: Hampton Court AQMA; Metropolitan Open Land about 96 m away.
Not affected
Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Elmbridge - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Elmbridge
Application type
Full Application
Postcode
KT8 9AF
Received
14 Oct 2025
Validated
19 Dec 2025
Ward
Molesey East Ward

Decision outlook

Day 335, past the statutory target. 79% of changes of use in Elmbridge are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 24 Sept 2026.

Day 335279 days past the 56-day target
43%decided within 8 weeks
51%approved
89decided in the last year

Plota live figures for changes of use decided by Elmbridge in the last twelve months, from validation. Elmbridge decision record →

Elmbridge
Planning Authority Score
2.6/10
Poor
#247 of 296 councils
Relevant to this application:
Change of use

Elmbridge ranks #195 out of 296 councils for householder decision speed. Elmbridge is also one of the strictest councils - it refuses more householder applications than almost any other, with only 79% approved vs 90% nationally.

One of the strictest councils
only 79% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Elmbridge decision statistics
Based on MHCLG data, the year to March 2026
77%
Overall approval rate
Below avg (87%) #277 of 296
79%
Householder approved
Below avg (90%) #281 of 296
57%
Decided in 8 weeks
Below avg (63%) #195 of 296
44%
Extended time limit
Above avg (41%) #178 of 296
68%
Minor dwellings approved
195 decided (1-9 homes)
60%
Major dwellings approved
15 decided (10+ homes)
72%
Change of use approved
32 decided
1,358
Total decisions
314 refused in the year to March 2026