Land Adjoining Leckhampton Farm Court Farm Lane Leckhampton Cheltenham Gloucestershire Data via plota.co.uk

26/00673/CONDIT - Non-compliance or variation of condition Approved

Proposal

Variation of condition 2 (approved plans) of granted permission  to allow for the addition of triple garage between plots 10 and 11 with associated layout changes, minor repositioning of garage at plot 5, House type C5 in plots 1, 2 and 17 to be handed, and a minor alteration to house type N4 at plots 6 and 9. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
23 Apr 2026
✓
Validated
2 May 2026
✓
Consultation
21 Jul 2026
✓
Approved
6 Aug 2026

Approved on 6 Aug 2026 · Delegated Decision · Last checked 6 Aug 2026

Associated applications 4

Site constraints 5

Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
National landscape 124 m away: Cotswolds; 2 listed buildings within 150 m; Scheduled monument 238 m away: Moated site and fishponds at Church Farm.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Cheltenham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Cheltenham
Application type
Non-compliance or variation of condition
Received
23 Apr 2026
Validated
2 May 2026
Ward
Leckhampton
Parish
Leckhampton With Warden Hill
Case officer
Show
Target decision
1 Aug 2026
Decision
Permit
Decision date
6 Aug 2026
Decision level
Delegated Decision
Applicant
Show

Public comments

1comment received
1 objecting

18 neighbours consulted · Last counted 6 Aug 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14879201
Planning Portal ref
PP-14879201
Neighbours
5 May 2026
Consultation
21 Jul 2026
Comments by
28 Jul 2026
Site or press notice
14 May 2026
Statutory expiry
1 Aug 2026
Env. assessment
No
Cheltenham
Planning Authority Score
8.7/10
Excellent
#11 of 296 councils
Relevant to this application:
Householder decisions

Cheltenham is faster than most councils at deciding householder applications, ranking #63 out of 296. Only 28% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are more likely to be approved here than most councils, with a 98% approval rate vs 90% nationally.

More permissive than most councils
98% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Cheltenham decision statistics
Based on MHCLG data, the year to March 2026
97%
Overall approval rate
Above avg (87%) #2 of 296
98%
Householder approved
Above avg (90%) #13 of 296
76%
Decided in 8 weeks
Above avg (63%) #63 of 296
28%
Extended time limit
Below avg (41%) #43 of 296
90%
Minor dwellings approved
60 decided (1-9 homes)
82%
Major dwellings approved
11 decided (10+ homes)
89%
Change of use approved
18 decided
927
Total decisions
30 refused in the year to March 2026