Plot 7a (Blackpool Airport Enterprise Zone) Land Bounded by Amy Johnson Way and Common Edge Road, Blackpool, FY4 5DY Data via plota.co.uk

25/0876 - Reserved Matters Approved

Proposal

Erection of a building for use as a storage and distribution centre (1,742sqm Use Class B8) with associated service yard, access from spine road, parking, landscaping and boundary treatments. (Reserved matters application associated with outline permission ). Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
5 Dec 2025
✓
Consultation
12 Dec 2025
✓
Approved
24 Feb 2026

Approved on 24 Feb 2026 · Development Control Committee · Last checked 15 Nov 2026

Planning committee

Decided by Blackpool Planning Committee on 24 Feb 2026.

Approved

As officers recommended.

  • Officers advised approval because the design, access, layout and landscaping were appropriate and would support employment and biodiversity.
  • Consultees raised no objections subject to safeguards, and no public representations were received.
  • The committee resolved to grant reserved matters approval subject to the listed conditions.
Read how the committee decided The proposal, site history, officers’ assessment, consultation responses, public representations, committee discussion and decision.

Source: Plota analysis of Blackpool's committee minutes of 24 Feb 2026.

Documents 40

All documents on the council site ↗

Associated applications 12

Site constraints 8

Marton Moss conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Article 4 direction
Article 4 Direction - C3 to C4 HMO. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
National infrastructure project about 507 m away: Morgan and Morecambe Offshore Wind Farms Transmission Assets
The site is about 507 m from the project boundary. Electricity line, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Inside the Blackpool built-up area; Green belt about 70 m away: Blackpool; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 2, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Looking for land for a warehouse?

Plota Sites searches every land parcel in England and Wales: 11,482 sites fit this search. On and off the market, free to search.

Land for big warehouses
Work with planning data?

Every application in Blackpool - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Blackpool
Application type
Reserved Matters
Postcode
FY4 5DY
Received
5 Dec 2025
Validated
5 Dec 2025
Ward
Stanley
Case officer
Show
Target decision
6 Mar 2026
Decision
Granted Conditionally
Decision date
24 Feb 2026
Decision level
Development Control Committee
Applicant
Show
Agent
Cassidy & Ashton Group Ltd

How this decision compares

Decided in 81 days from validation, 25 days faster than Blackpool's median of 106 for reserved matters. Approved, as 97% of reserved matters here are.

22%decided within 8 weeks
97%approved
11%go to committee

Plota live figures for reserved matters decided across the UK in the last twelve months, from validation; too few recent reserved matters in Blackpool to go on. Blackpool decision record →

Public comments

No public comments yet.

Last counted 5 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14476440
Planning Portal ref
PP-14476440
Neighbours
12 Dec 2025
Consultation
12 Dec 2025
Comments by
20 Jan 2026
Site or press notice
19 Dec 2025
Committee
24 Feb 2026
Statutory expiry
6 Mar 2026
Env. assessment
No
Blackpool
Planning Authority Score
3.8/10
Below average
#204 of 296 overall
Relevant to this application:
Major dwellings

Blackpool is #101 of 296 councils on householder decision speed. Blackpool is also one of the strictest councils - it refuses more householder applications than almost any other, with only 78% approved vs 90% nationally.

One of the strictest councils
only 78% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Blackpool decision statistics
Based on MHCLG data, the year to March 2026
83%
Overall approval rate
Below avg (87%) #232 of 296
78%
Householder approved
Below avg (90%) #285 of 296
72%
Decided in 8 weeks
Above avg (63%) #101 of 296
43%
Extended time limit
Above avg (41%) #169 of 296
58%
Minor dwellings approved
19 decided (1-9 homes)
100%
Major dwellings approved
2 decided (10+ homes)
83%
Change of use approved
41 decided
351
Total decisions
60 refused in the year to March 2026