Changing Room Facilties Jepson Way, Blackpool Data via plota.co.uk

26/0495 - Prior Approval Demolition Approved

Proposal

Demolition of former changing room facilities. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
14 Sept 2026
✓
Consultation
17 Sept 2026
✓
Approved
15 Oct 2026

Approved on 15 Oct 2026 · Delegated · Last checked 15 Nov 2026

Site constraints 5

Article 4 direction
Article 4 Direction - C3 to C4 HMO. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
National infrastructure project 652 m away: Morgan and Morecambe Offshore Wind Farms Transmission Assets
The site is 652 m from the project boundary. Electricity line, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Conservation area 63 m away: Marton Moss; Inside the Blackpool built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Blackpool - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Blackpool
Application type
Prior Approval Demolition
Received
14 Sept 2026
Validated
14 Sept 2026
Ward
Stanley
Case officer
Show
Target decision
16 Oct 2026
Decision
Prior Approval Required and Granted
Decision date
15 Oct 2026
Decision level
Delegated
Applicant
Show
Agent
Cassidy & Ashton

How this decision compares

Decided in 31 days from validation, about the council's usual 34 days. Approved, as 100% of prior approvals here are.

91%decided within 8 weeks
100%approved
9%go to committee

Plota live figures for prior approvals decided by Blackpool in the last twelve months, from validation. Blackpool decision record →

Public comments

No public comments yet.

Last counted 1 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15079686
Planning Portal ref
PP-15079686
Consultation
17 Sept 2026
Statutory expiry
16 Oct 2026
Env. assessment
No
Blackpool
Planning Authority Score
3.8/10
Below average
#204 of 296 overall
Relevant to this application:
Householder decisions

Blackpool is #101 of 296 councils on householder decision speed. Blackpool is also one of the strictest councils - it refuses more householder applications than almost any other, with only 78% approved vs 90% nationally.

One of the strictest councils
only 78% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Blackpool decision statistics
Based on MHCLG data, the year to March 2026
83%
Overall approval rate
Below avg (87%) #232 of 296
78%
Householder approved
Below avg (90%) #285 of 296
72%
Decided in 8 weeks
Above avg (63%) #101 of 296
43%
Extended time limit
Above avg (41%) #169 of 296
58%
Minor dwellings approved
19 decided (1-9 homes)
100%
Major dwellings approved
2 decided (10+ homes)
83%
Change of use approved
41 decided
351
Total decisions
60 refused in the year to March 2026