60 Eaton Square London SW1W 9BG Data via plota.co.uk

26/07703/FULL - Full Planning Permission Application Pending

Proposal

Refurbishment of the ground and lower ground floor flat, including relocation of the gas boiler to an enclosure in the rear garden, creation of an ensuite to the master bedroom, replacement of doors with fire-rated doors, installation of a new stair handrail and balusters, rewiring to current IEE standards with a new electrical cupboard at lower ground floor, and replacement of the bathroom and kitchen and associated MEPHE. Relocation of the gas boiler enclosure is proposed as permitted two gardens along at No. 58A (04_03120_LBC and 04-03119-FULL). (Linked to 26/07704/LBC) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
12 Nov 2026
Decision
Expected by 7 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision between 2 Jan 2027 and 11 Jan 2027, from Westminster's recent extensions.

Site constraints 11

Grade II* listed: 51-62, Eaton Square Sw1
List entry 1066853 · The pin is inside its outline · 36 more listed buildings within 150 m (4 Grade II*, 32 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 36 with distances
Historic England ↗
Belgravia conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Article 4 direction
Article 4 Basement Development Permitted Rights Removed. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Archaeological priority area: City of Westminster APA 3.2
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Westminster AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 389 m away: Thames Tideway Tunnel
The site is 389 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, the site is inside its boundary).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Registered park or garden 23 m away: The Grosvenor Estate: Eaton Square
Its setting is a consideration for work nearby.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
Also on the record
Wider setting of protected view 9A.1 King Henry's Mound to St Paul's Cathedral; Inside the City of Westminster built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square; Tree preservation order 23 m away: W10_A4.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 16 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Westminster - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission Application
Postcode
SW1W 9BG
Received
12 Nov 2026
Validated
12 Nov 2026
Ward
Knightsbridge & Belgravia
Case officer
Show
Target decision
7 Jan 2027
Applicant
Show
Agent
Grosvenor Property UK

Decision outlook

Day 6 of the 56-day target. Westminster usually decides extensions by day 55.

Day 650 days to the 56-day target
56%decided within 8 weeks
88%approved
1,931decided in the last year

Plota live figures for extensions decided by Westminster in the last twelve months, from validation. Westminster decision record →

Public comments

No public comments yet.

Last counted 16 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15364353
Planning Portal ref
PP-15364353
Env. assessment
No
Westminster
Planning Authority Score
3.5/10
Below average
#221 of 296 councils
Relevant to this application:
Householder decisions

Westminster is slower than most councils at deciding householder applications, ranking #258 out of 296. Only 28% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Westminster is also one of the strictest councils - it refuses more householder applications than almost any other, with only 81% approved vs 90% nationally.

One of the strictest councils
only 81% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Westminster decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #201 of 296
81%
Householder approved
Below avg (90%) #277 of 296
44%
Decided in 8 weeks
Below avg (63%) #258 of 296
28%
Extended time limit
Below avg (41%) #46 of 296
83%
Minor dwellings approved
12 decided (1-9 homes)
67%
Major dwellings approved
3 decided (10+ homes)
81%
Change of use approved
133 decided
4,602
Total decisions
648 refused in the year to March 2026