18 Minford Gardens London W14 0AN Data via plota.co.uk

2025/02786/FUL - Full Planning Application Approved

Proposal

Alterations to the existing front access steps to include, replacement of existing asphalt with new stone finish, and replacement of existing side metal railings like for like. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
9 Oct 2025
✓
Validated
21 Oct 2025
✓
Approved
16 Dec 2025

Approved on 16 Dec 2025 · Last checked 12 Oct 2026

Site constraints 8

Lakeside/Sinclair/Blythe Road conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Air quality management area: Hammersmith and Fulham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
National infrastructure project 1084 m away: Thames Tideway Tunnel; 2 listed buildings within 150 m; Inside the Hammersmith and Fulham built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square; Town centre 10 m away: Shepherds Bush Town Centre.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hammersmith and Fulham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Application
Postcode
W14 0AN
Received
9 Oct 2025
Validated
21 Oct 2025
Ward
Addison
Case officer
Show
Decision
APPLICATION APPROVED
Decision date
16 Dec 2025
Applicant
Show

How this decision compares

Decided in 56 days from validation, 21 days faster than Hammersmith and Fulham's median of 77 for full applications. Approved, as 98% of full applications here are.

28%decided within 8 weeks
98%approved
758decided in the last year

Plota live figures for full applications decided by Hammersmith and Fulham in the last twelve months, from validation. Hammersmith and Fulham decision record →

Consultation & key dates

Consultation
21 Oct 2025
Comments by
16 Dec 2025
Site or press notice
29 Oct 2025
Statutory expiry
16 Dec 2028
Hammersmith and Fulham
Planning Authority Score
3.7/10
Below average
#210 of 296 councils
Relevant to this application:
Householder decisions

Hammersmith and Fulham is one of the slowest councils in England for householder decisions, ranking #281 out of 296. The council extends the time limit on 63% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hammersmith and Fulham decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #20 of 296
99%
Householder approved
Above avg (90%) #4 of 296
33%
Decided in 8 weeks
Below avg (63%) #281 of 296
63%
Extended time limit
Above avg (41%) #275 of 296
97%
Minor dwellings approved
209 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
92%
Change of use approved
37 decided
1,321
Total decisions
60 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use