Flat First And Second Floors 36 Minford Gardens London W14 0AN Data via plota.co.uk

P/2026/02063/HH REGISTERED: Under Consultation

Proposal

Replacement of 3no existing single glazed timber framed windows with new double glazed timber framed windows at first and second floor levels to the front elevation; replacement of 1no existing single glazed timber framed window with new double glazed timber framed window at second floor level to the rear elevation. Data via plota.co.uk

View original council record ↗Last checked

Application progress

Validated
24 Aug 2026
Received
25 Aug 2026
Decision
Expected by 19 Oct 2026

This application is under consideration - no decision has been issued yet. Plota predicts a decision between 19 Oct 2026 and 4 Nov 2026, from Hammersmith and Fulham's recent extensions. Comments are open until 23 Sept 2026.

Comment on this application ↗

Documents 21

All documents on the council site ↗

Site constraints 5

Lakeside/Sinclair/Blythe Road conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Air quality management area: Hammersmith and Fulham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
2 listed buildings within 150 m
Nearest: Church of St Simon, Grade II, 48 m away · 2 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 2 with distances
Historic England ↗
Also on the record
Inside the Hammersmith and Fulham built-up area; Town centre 11 m away: Shepherds Bush Town Centre.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hammersmith and Fulham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Postcode
W14 0AN
Received
25 Aug 2026
Validated
24 Aug 2026
Ward
Addison
Case officer
Show
Applicant
Show

Decision outlook

Day 19 of the 56-day target. Hammersmith and Fulham usually decides extensions by day 65.

Day 1946 days to the predicted decision (day 65)
44%decided within 8 weeks
98%approved
244decided in the last year

Plota live figures for extensions decided by Hammersmith and Fulham in the last twelve months, from validation. Hammersmith and Fulham decision record →

Consultation & key dates

Consultation
25 Aug 2026
Comments by
23 Sept 2026
Site or press notice
2 Sept 2026
Statutory expiry
19 Oct 2026
Hammersmith and Fulham
Planning Authority Score
3.7/10
Below average
#210 of 296 councils
Relevant to this application:
Householder decisions

Hammersmith and Fulham is one of the slowest councils in England for householder decisions, ranking #281 out of 296. The council extends the time limit on 63% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hammersmith and Fulham decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #20 of 296
99%
Householder approved
Above avg (90%) #4 of 296
33%
Decided in 8 weeks
Below avg (63%) #281 of 296
63%
Extended time limit
Above avg (41%) #275 of 296
97%
Minor dwellings approved
209 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
92%
Change of use approved
37 decided
1,321
Total decisions
60 refused in the year to March 2026