3 Orchard Drive, Littlestone, New Romney, Kent, TN28 8SE Data via plota.co.uk

26/1730/FH - Works to Trees covered by a TPO Under Consultation

Proposal

Works to trees subject to TPO No 04 of 1985 comprising of T1-2 Poplar pollard to 8 metres. T3-4 Maple crown reduction of 3 metres vertically and laterally. T5 Beech vertical reduction of 4 metres. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
21 Oct 2026
✓
Validated
16 Nov 2026
Decision
Expected by 11 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision around 18 Dec 2026, from Shepway's recent tree and landscaping works.

Comments are open until 7 Dec 2026

Comment on this application ↗

Site constraints 6

In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Ramsar wetland 84 m away: Dungeness, Romney Marsh and Rye Bay
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Designation record ↗
SSSI 84 m away: Rye Harbour SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Inside the Littlestone-on-Sea built-up area; National infrastructure project 1.4 km away: South Brooks Solar Farm, at pre-application.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 16 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 2

Last sold for £482,000 in June 2017. Detached house, freehold.

21 June 2017£482,000
27 June 1997£170,000New build

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area170 m² (1,830 sq ft)
Energy ratingC (80 out of 100)
PropertyDetached house, 8 habitable rooms
Built1996 to 2002
HeatingBoiler and radiators, mains gas
WallsCavity wall, as built, insulated (assumed)

From the energy performance certificate lodged in February 2016, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in Shepway - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Shepway
Application type
Works to Trees covered by a TPO
Postcode
TN28 8SE
Received
21 Oct 2026
Validated
16 Nov 2026
Ward
New Romney
Parish
New Romney
Case officer
Show
Target decision
11 Jan 2027

Decision outlook

Day 7 of the 56-day target. Shepway usually decides tree and landscaping works by day 32.

Day 749 days to the 56-day target
100%decided within 8 weeks
93%approved
218decided in the last year

Plota live figures for tree and landscaping works decided by Shepway in the last twelve months, from validation. Shepway decision record →

Public comments

No public comments yet.

Last counted 16 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
7 Dec 2026
Shepway
Planning Authority Score
7.4/10
Good
#49 of 296 overall
Relevant to this application:
Householder decisions

Shepway is one of the fastest councils in England for householder decisions: #5 of 296 on speed. Only 12% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Shepway decision statistics
Based on MHCLG data, the year to March 2026
82%
Overall approval rate
Below avg (87%) #247 of 296
88%
Householder approved
Below avg (90%) #219 of 296
96%
Decided in 8 weeks
Above avg (63%) #5 of 296
12%
Extended time limit
Below avg (41%) #5 of 296
61%
Minor dwellings approved
95 decided (1-9 homes)
100%
Major dwellings approved
13 decided (10+ homes)
69%
Change of use approved
32 decided
761
Total decisions
139 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.