1A Dane Bank Drive, Disley, Stockport, Cheshire East, SK12 2BD Data via plota.co.uk

26/3903/TPO - Works to TPO Trees Pending Consideration

Proposal

T1 - Ash Tree is in severe decline due to Ash Dieback and contains significant deadwood in the upper canopy. There are targets beneath in both gardens. We would categorise the condition to be Stage 3 ADB and would not consider the tree to be in a safe condition for climbing or rigging operations. However, there are signs of reaction growth from lower in the canopy and the owners would like to retain the tree if at all possible. The proposed work would be undertaken using MEWP for canopy access. Crown reduce by approx 6-8m to effectively create a new "pollard", retaining the main leaders at approx 10m in height. The proposed work is a very heavy reduction that we would not ordinarily recommend, but would seem to be the only way to retain the tree, given the extent of the decay in the upper canopy. There will need to be ongoing management of the regrowth from the pruning points, approx every 3-5 years, depending on the vigour of the regrowth. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
26 Oct 2026
Decision
Expected by 21 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 17 Dec 2026 and 1 Jan 2027, from Cheshire East's recent tree and landscaping works.

Site constraints 7

Also on the record
9 listed buildings within 150 m; Radon affected area, class 2; Scheduled monument 198 m away: Cross base in the churchyard of St Mary's Church; Coalfield, development low risk area; National infrastructure project 497 m away: Peak Cluster CCS Pipeline, at pre-application; Inside the Disley built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 4, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Cheshire East - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Works to TPO Trees
Postcode
SK12 2BD
Received
26 Oct 2026
Validated
26 Oct 2026
Ward
Disley
Parish
Disley
Case officer
Show
Target decision
21 Dec 2026
Decision level
Delegation
Applicant
Show
Agent
Swift Tree Services

Decision outlook

Day 28 of the 56-day target. Cheshire East usually decides tree and landscaping works by day 57.

Day 2829 days to the predicted decision (day 57)
50%decided within 8 weeks
96%approved
652decided in the last year

Plota live figures for tree and landscaping works decided by Cheshire East in the last twelve months, from validation. Cheshire East decision record →

Consultation & key dates

Statutory expiry
21 Dec 2026
Cheshire East
Planning Authority Score
1.9/10
Poor
#274 of 296 overall
Relevant to this application:
Householder decisions

Cheshire East is one of the slowest councils in England for householder decisions: #268 of 296 on speed. The council extends the time limit on 65% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Cheshire East decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #168 of 296
91%
Householder approved
Above avg (90%) #170 of 296
39%
Decided in 8 weeks
Below avg (63%) #268 of 296
65%
Extended time limit
Above avg (41%) #279 of 296
72%
Minor dwellings approved
358 decided (1-9 homes)
76%
Major dwellings approved
25 decided (10+ homes)
79%
Change of use approved
119 decided
2,513
Total decisions
321 refused in the year to March 2026