4 Lanwithan Close Lostwithiel Cornwall PL22 0ED Data via plota.co.uk

PA26/06882 - Tree Preservation Order Awaiting decision

Proposal

Works to trees subject to a Tree Preservation Order(TPO) Oak trees - T1 remove entire limb growing towards house as indicated T2-reduce back over extending limb to suitable growth point in line with the rest of the canopy. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 6 Oct 2026
Decision
Expected by 1 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 12 Nov 2026, from Cornwall's recent tree and landscaping works.

Site constraints 6

Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Radon affected area, class 6
An estimated 30% or more of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
Conservation area 46 m away: Lostwithiel; 4 listed buildings within 150 m; Inside the Lostwithiel built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 7 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 2

Last sold for £220,000 in October 2002. Detached house, freehold.

18 October 2002£220,000
13 September 1999£92,500New build

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Work with planning data?

Every application in Cornwall - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Cornwall
Application type
Tree Preservation Order
Postcode
PL22 0ED
Received
around 6 Oct 2026
Validated
6 Oct 2026
Ward
Lostwithiel And Lanreath
Parish
Lostwithiel
Case officer
Show
Target decision
1 Dec 2026
Applicant
Show
Agent
Ironwood Tree Surgery Ltd

Decision outlook

Day 3 of the 56-day target. Cornwall usually decides tree and landscaping works by day 37.

Day 353 days to the 56-day target
95%decided within 8 weeks
88%approved
846decided in the last year

Plota live figures for tree and landscaping works decided by Cornwall in the last twelve months, from validation. Cornwall decision record →

Public comments

No public comments yet.

Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15269845
Planning Portal ref
PP-15269845
Statutory expiry
1 Dec 2026
Env. assessment
No
Cornwall
Planning Authority Score
7.9/10
Good
#28 of 296 councils
Relevant to this application:
Householder decisions

Cornwall is faster than most councils at deciding householder applications, ranking #64 out of 296. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Cornwall decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #79 of 296
97%
Householder approved
Above avg (90%) #28 of 296
76%
Decided in 8 weeks
Above avg (63%) #64 of 296
35%
Extended time limit
Below avg (41%) #101 of 296
82%
Minor dwellings approved
1180 decided (1-9 homes)
94%
Major dwellings approved
67 decided (10+ homes)
93%
Change of use approved
194 decided
4,839
Total decisions
363 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.