GFW Limited (The Furniture Warehouse) Waterside Business Park Johnson Road Waterside Darwen BB3 3RT Data via plota.co.uk

10/26/0371 - Full Planning Application Approved

Proposal

Erection of a storage building (B8) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
20 Apr 2026
✓
Validated
11 May 2026
✓
Approved
16 Oct 2026

Approved on 16 Oct 2026 · Planning and Highways Committee · Last checked 19 Oct 2026

Planning committee

Decided by Blackburn Planning and Highways Committee on 15 Oct 2026.

Approved

No officer report was published for this decision; this summary is from the committee minutes.

  • The officer’s recommendations were considered and proposed by Councillor Quesir Mahmood, with Councillor Jim Casey seconding.
  • No registered speaker was recorded.
  • The application was approved subject to the conditions in section 5 of the report.

Source: Plota analysis of Blackburn's committee minutes, Blackburn Planning and Highways Committee minutes, 15 October 2026 .

Documents 27

All documents on the council site ↗

Site constraints 6

Green belt: Merseyside and Greater Manchester
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 4. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
Coalfield, development low risk area.
Not affected
No listed building at the site · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Blackburn - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Blackburn
Application type
Full Planning Application
Postcode
BB3 3RT
Received
20 Apr 2026
Validated
11 May 2026
Ward
West Pennine
Parish
Blackburn
Case officer
Show
Target decision
19 Oct 2026
Decision
PERMITS
Decision date
16 Oct 2026
Decision level
Planning and Highways Committee
Applicant
Show
Agent
PWA Planning

How this decision compares

Decided in 158 days from validation, 84 days slower than Blackburn's median of 74 for commercial and major works. Approved, as 98% of commercial and major works here are.

43%decided within 8 weeks
98%approved
25%go to committee

Plota live figures for commercial and major works decided by Blackburn in the last twelve months, from validation. Blackburn decision record →

Consultation & key dates

Committee
15 Oct 2026
Statutory expiry
19 Oct 2026
Blackburn
Planning Authority Score
7.2/10
Good
#55 of 296 councils
Relevant to this application:
Householder decisions

Blackburn is faster than most councils at deciding householder applications, ranking #90 out of 296. Householder applications are more likely to be approved here than most councils, with a 98% approval rate vs 90% nationally.

More permissive than most councils
98% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Blackburn decision statistics
Based on MHCLG data, the year to March 2026
96%
Overall approval rate
Above avg (87%) #7 of 296
98%
Householder approved
Above avg (90%) #10 of 296
73%
Decided in 8 weeks
Above avg (63%) #90 of 296
40%
Extended time limit
Below avg (41%) #147 of 296
88%
Minor dwellings approved
40 decided (1-9 homes)
100%
Major dwellings approved
7 decided (10+ homes)
86%
Change of use approved
56 decided
519
Total decisions
23 refused in the year to March 2026