RESIDENTIAL GARAGE BLOCK OPPOSITE 2A Chester Road, Wimbledon, Merton Data via plota.co.uk

25/T2658 - Tree(s) in a Conservation Area Approved

Proposal

T1 - Sycamore - Crown lift up to 5.0m. T2 - Lime - NWR for Development. T3 - Western Red Cedar - Crown lift up to 3.0m AGL. T3.1 - Western Red Cedar - Crown lift up to 3.0m AGL. T4 - Sycamore - Fell to ground level and treat stump to prevent regrowth. T4.1 - Sycamore - Fell to ground level and treat stump to prevent regrowth. G5 - Sycamore x 5 - Fell group to ground level and treat stump to prevent regrowth. Replace with a single new Sycamore positioned further from the boundary. T6 - Hawthorn - Cut back crown to boundary. T7 - Crab Apple - Cut back crown to 1.5m from boundary and prune to clear roof by 1m. G8 - Holly x 2 - Cut back crown to boundary. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
3 Sept 2025
✓
Approved
13 Oct 2025

Approved on 13 Oct 2025 · Delegated · Last checked 18 Oct 2026

Documents 6

Decision & officer reports 1

PDF Commenter’s name hidden Show Supporting Document Planning Public View ↗

Statements & assessments 2

PDF Commenter’s name hidden Show Supporting Document Planning Public View ↗
PDF Commenter’s name hidden Show Supporting Document Planning Public View ↗

Plans & drawings 1

PDF Commenter’s name hidden Show Supporting Document Planning Public View ↗

Other documents 2

PDF Commenter’s name hidden Show Supporting Document Planning Public View ↗
PDF Commenter’s name hidden Show Supporting Document Planning Public View ↗

All documents on the council site ↗

Site constraints 13

Wimbledon West conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Merton AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Special area of conservation 92 m away: Wimbledon Common
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Registered park or garden 21 m away: Cannizaro Park
Its setting is a consideration for work nearby.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
SSSI 92 m away: Wimbledon Common SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
6 listed buildings within 150 m
Nearest: West Side House, Grade II, 48 m away · 6 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 6 with distances
Historic England ↗
Also on the record
Inside the Merton built-up area; Public transport access: PTAL 0 (very poor), TfL 2023, for the 100 m square; Designated open space 7 m away; Priority habitat 15 m away: Deciduous woodland; Metropolitan Open Land 21 m away.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Merton - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Merton
Application type
Tree(s) in a Conservation Area
Received
3 Sept 2025
Validated
3 Sept 2025
Ward
Village
Parish
Historic
Case officer
Show
Target decision
15 Oct 2025
Decision
Tree Works Approved
Decision date
13 Oct 2025
Decision level
Delegated
Applicant
Show

How this decision compares

Decided in 40 days from validation, 10 days faster than Merton's median of 50 for tree and landscaping works. Approved, as 99% of tree and landscaping works here are.

70%decided within 8 weeks
99%approved
650decided in the last year

Plota live figures for tree and landscaping works decided by Merton in the last twelve months, from validation. Merton decision record →

Consultation & key dates

Committee
13 Oct 2025
Statutory expiry
15 Oct 2025
Merton
Planning Authority Score
4.5/10
Below average
#173 of 296 overall
Relevant to this application:
Other decisions

Merton is #196 of 296 councils on householder decision speed. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Merton decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #135 of 296
92%
Householder approved
Above avg (90%) #158 of 296
57%
Decided in 8 weeks
Below avg (63%) #196 of 296
39%
Extended time limit
Below avg (41%) #139 of 296
54%
Minor dwellings approved
82 decided (1-9 homes)
100%
Major dwellings approved
11 decided (10+ homes)
83%
Change of use approved
24 decided
1,079
Total decisions
115 refused in the year to March 2026