Land At 348146 140060 Meare Road Glastonbury Somerset Data via plota.co.uk

2026/1407/FUL - Full Application Refused

Proposal

Proposed agricultural barn. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
23 Jul 2026
✓
Validated
4 Aug 2026
✗
Refused
20 Oct 2026
Appeal
Not lodged

Refused on 20 Oct 2026 · Delegated Decision · Last checked 19 Nov 2026

Documents 24

All documents on the council site ↗

Site constraints 6

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Nutrient neutrality catchment: Brue Catchment
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Priority habitat: Coastal and floodplain grazing marsh
A habitat of principal importance. It shapes the ecology work and the biodiversity net gain a scheme has to show.
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 4. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Restorable Habitat
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Nature recovery project: Somerset Coast, Levels and Moors.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Mendip - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Mendip
Application type
Full Application
Received
23 Jul 2026
Validated
4 Aug 2026
Ward
Glastonbury Division
Parish
Glastonbury Town Council
Case officer
Show
Target decision
20 Oct 2026
Decision
Refusal
Decision date
20 Oct 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Tor Architectural Services

How this decision compares

Decided in 77 days from validation, 34 days slower than Mendip's median of 43 for agricultural works. Refused, as 36% of agricultural works here are.

80%decided within 8 weeks
64%approved
106decided in the last year

Plota live figures for agricultural works decided by Mendip in the last twelve months, from validation. Mendip decision record →

Public comments

No public comments yet.

2 neighbours consulted · Last counted 19 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
2 Sept 2026
Statutory expiry
29 Sept 2026
Env. assessment
No