Hainsworth Park Golf Club Starcarr Lane Brandesburton East Riding Of Yorkshire YO25 8RT Data via plota.co.uk

Pending 26/02640/TPO
Date received
2 Oct 2026
Date validated
6 Oct 2026
Postcode
YO25 8RT

Description

TPO - BRANDESBURTON PARK - 1976 (REF 472) A1 - Side reduce 1 no. Ash tree (T1) by 3 metres to reduce overhang over garden and to lighten limbs to help prevent failure into garden Data via plota.co.uk

Last checked

Decision outlook

Plota predicts a decision around 11 Nov 2026, from East Riding's recent tree and landscaping works.

Day 3 of the 56-day target. East Riding usually decides tree and landscaping works by day 36.

Day 353 days to the 56-day target
94%decided within 8 weeks
97%approved
582decided in the last year

Plota live figures for tree and landscaping works decided by East Riding in the last twelve months, from validation. East Riding decision record →

Site constraints 3

Also on the record
National infrastructure project about 448 m away: Dogger Bank D Wind Farm, at pre-application; Inside the Brandesburton built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 8 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Riding - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service
East Riding
Planning Authority Score
8.1/10
Excellent
#24 of 296 councils
Relevant to this application:
Householder decisions

East Riding is one of the fastest councils in England for householder decisions, ranking #7 out of 296. Only 14% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
East Riding decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #110 of 296
92%
Householder approved
Above avg (90%) #152 of 296
95%
Decided in 8 weeks
Above avg (63%) #7 of 296
14%
Extended time limit
Below avg (41%) #9 of 296
76%
Minor dwellings approved
190 decided (1-9 homes)
95%
Major dwellings approved
42 decided (10+ homes)
86%
Change of use approved
79 decided
1,887
Total decisions
198 refused in the year to March 2026