Royal Parks, Greenwich Park, Blackheath Avenue, Greenwich, SE10 8QY Data via plota.co.uk

25/3348/NM - Non Material Approved

Proposal

An application submitted under Section 96a of the Town & Country Planning Act 1990 for a non-material amendment in connection with the planning permission , dated 04/09/2020, to allow amendments to the design of the canopy for the Wolfe Kiosk. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
8 Oct 2025
✓
Approved
8 Oct 2025

Approved on 8 Oct 2025 · Delegation · Last checked 21 Nov 2026

Site constraints 12

World heritage site: Maritime Greenwich
Nationally designated heritage. Its significance and setting carry great weight.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
Blackheath conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Priority habitat: Deciduous woodland
A habitat of principal importance. It shapes the ecology work and the biodiversity net gain a scheme has to show.
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Greenwich AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Habitat network: Wood pasture and parkland
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
National infrastructure project 689 m away: Thames Tideway Tunnel
The site is 689 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: Silvertown Tunnel (decided, 1.8 km); London Strategic Heat Main Project (at pre-application, 658 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Radon affected area, class 2; Scheduled monument 206 m away: Greenwich Observatory; 3 listed buildings within 150 m; Public transport access: PTAL 1a (very poor), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI), Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area159 m² (1,711 sq ft)
Energy ratingE (42 out of 100), could reach C
PropertyDetached house, 5 habitable rooms
BuiltBefore 1900
HeatingBoiler and radiators, mains gas
WallsSolid brick, as built, no insulation (assumed)

From the energy performance certificate lodged in December 2019, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Greenwich - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Greenwich
Application type
Non Material
Postcode
SE10 8QY
Received
8 Oct 2025
Validated
8 Oct 2025
Ward
GREENWICH PARK
Parish
Greenwich
Case officer
Show
Target decision
5 Nov 2025
Decision
Approve
Decision date
8 Oct 2025
Decision level
Delegation
Applicant
Show
Agent
LUC

How this decision compares

Decided in 0 days from validation, 55 days faster than Greenwich's median of 55 for amendments. Approved, as 83% of amendments here are.

67%decided within 8 weeks
83%approved
125decided in the last year

Plota live figures for amendments decided by Greenwich in the last twelve months, from validation. Greenwich decision record →

Public comments

No public comments yet.

Last counted 21 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
5 Nov 2025
Env. assessment
No
Greenwich
Planning Authority Score
5.4/10
Average
#123 of 296 overall
Relevant to this application:
Householder decisions

Greenwich is faster than most councils at deciding householder applications: #76 of 296 on speed. Only 29% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Greenwich is also one of the strictest councils - it refuses more householder applications than almost any other, with only 78% approved vs 90% nationally.

One of the strictest councils
only 78% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Greenwich decision statistics
Based on MHCLG data, the year to March 2026
77%
Overall approval rate
Below avg (87%) #278 of 296
78%
Householder approved
Below avg (90%) #287 of 296
75%
Decided in 8 weeks
Above avg (63%) #76 of 296
29%
Extended time limit
Below avg (41%) #49 of 296
60%
Minor dwellings approved
114 decided (1-9 homes)
100%
Major dwellings approved
13 decided (10+ homes)
66%
Change of use approved
195 decided
1,468
Total decisions
331 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.