37 Brushfield Street, London, E1 6AA Data via plota.co.uk

PA/25/02027/NC - Advertisement Consent Registered

Proposal

Proposed works to include; Red -reeded film with perimeter LED Lighting around window frames on the stores first floor covering 18 glass window bay panels Opaque film on the remaining first floor window bay panels to match existing colour 11 panels Relocation of existing 'ON' hanging illuminated sign to the first floor on the same window panel Installation of one new 'ON' hanging illuminated sign, identical to the existing sign, on the right side of Bishops Square at a first-floor window panel. Placement of temporary green vinyl hoarding on ground floor window panels during construction, covering 16 panels, including: - 4 panels with 'ON Spitalfields' text in black. - 4 panels with 'ON' text in black. - All hoarding panels to display 'opening soon' and 'ON.com' text. Addition of 'we are hiring' text on 3 glass panels of existing doors. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 28 Nov 2025
Decision
Target date was 23 Jan 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 23 Nov 2026; it is now day 360.

Site constraints 11

Archaeological priority area: Tower Hamlets APA 2.12
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Tower Hamlets AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Scheduled monument 57 m away: Priory and Hospital of St Mary Spital
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
31 listed buildings within 150 m
Nearest: Lamp Standard in Front of No 38, Grade II, 32 m away · 1 Grade I, 1 Grade II*, 29 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 31 with distances
Historic England ↗
Conservation area 17 m away: Artillery Passage
The edge of the area; work outside it can still affect its setting.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
National infrastructure project 1 km away: Thames Tideway Tunnel
The site is 1 km from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 371 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Heritage at risk 57 m away: Priory and Hospital of St Mary Spital, Steward Street; Inside the Tower Hamlets built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Tower Hamlets - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Advertisement Consent
Postcode
E1 6AA
Received
around 28 Nov 2025
Validated
28 Nov 2025
Ward
Spitalfields and Banglatown
Case officer
Show
Target decision
23 Jan 2026
Decision level
Delegated
Applicant
Show
Agent
ML Projects

Decision outlook

Day 360, past the statutory target. 91% of signs and adverts in Tower Hamlets are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 21 Nov 2026.

Day 360304 days past the 56-day target
67%decided within 8 weeks
85%approved
100decided in the last year

Plota live figures for signs and adverts decided by Tower Hamlets in the last twelve months, from validation. Tower Hamlets decision record →

Consultation & key dates

Statutory expiry
23 Jan 2026
Env. assessment
No
Tower Hamlets
Planning Authority Score
3.9/10
Below average
#201 of 296 overall
Relevant to this application:
Other decisions

Tower Hamlets is slower than most councils at deciding householder applications: #207 of 296 on speed. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Tower Hamlets decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #229 of 296
92%
Householder approved
Above avg (90%) #167 of 296
56%
Decided in 8 weeks
Below avg (63%) #207 of 296
42%
Extended time limit
Above avg (41%) #167 of 296
63%
Minor dwellings approved
52 decided (1-9 homes)
80%
Major dwellings approved
15 decided (10+ homes)
55%
Change of use approved
67 decided
998
Total decisions
164 refused in the year to March 2026