DC/26/00994/HHA - Householder Application Awaiting decision

Proposal

Proposed new solid pitched roof and brickwork to existing flat roof single storey rear conservatory Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
16 Nov 2026
Decision
Expected by 11 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision between 13 Jan 2027 and 28 Jan 2027, from Gateshead's recent extensions.

Comments are open until 10 Dec 2026

Comment on this application ↗

Site constraints 4

National infrastructure project 504 m away: A1 Birtley to Coal House Improvement Scheme
The site is 504 m from the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Radon affected area, class 2; Coalfield, development low risk area; Inside the Gateshead built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 20 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area117 m² (1,259 sq ft)
Energy ratingD (59 out of 100), could reach C
PropertySemi-detached house, 6 habitable rooms
Built1950 to 1966
HeatingBoiler and radiators, mains gas
WallsCavity wall, filled cavity

From the energy performance certificate lodged in April 2026, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in Gateshead - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Gateshead
Application type
Householder Application
Postcode
NE9 6LA
Received
16 Nov 2026
Validated
16 Nov 2026
Ward
Chowdene
Case officer
Show
Target decision
11 Jan 2027
Applicant
Show

Decision outlook

Day 7 of the 56-day target. Gateshead usually decides extensions by day 64.

Day 757 days to the predicted decision (day 64)
38%decided within 8 weeks
97%approved
223decided in the last year

Plota live figures for extensions decided by Gateshead in the last twelve months, from validation. Gateshead decision record →

Public comments

No public comments yet.

4 neighbours consulted · Last counted 22 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
10 Dec 2026
Statutory expiry
11 Jan 2027
Env. assessment
No
Gateshead
Planning Authority Score
2.4/10
Poor
#255 of 296 overall
Relevant to this application:
Householder decisions

Gateshead is one of the slowest councils in England for householder decisions: #289 of 296 on speed. The council extends the time limit on 67% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Gateshead decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #130 of 296
94%
Householder approved
Above avg (90%) #107 of 296
26%
Decided in 8 weeks
Below avg (63%) #289 of 296
67%
Extended time limit
Above avg (41%) #282 of 296
58%
Minor dwellings approved
24 decided (1-9 homes)
100%
Major dwellings approved
4 decided (10+ homes)
70%
Change of use approved
37 decided
482
Total decisions
54 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.