Proposal

Proposed works include overcladding three flat roofs with liquid applied systems, installation of a mansafe system, replacement of rotten boards to chute openings with marine ply and lead and repair or replacement of rainwater goods in matching materials. Further works comprise repairs to corroded guardrails, gantries, ladders, and the elevator leg, removal of vegetation and graffiti with repainting to match existing, replacement of timber boards to the dock terrace, vermin-proofing measures including mesh infills and window repairs and erection of scaffolding to facilitate the works. (This application site affects the settings of Listed Building). Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
13 Apr 2026
✓
Approved
14 Jul 2026

Approved on 14 Jul 2026 · Delegated decision · Last checked 19 Jul 2026

Licences at this address

  • Licence Broadwick Live Premises licence · in force Hours not given on the register
  • Licence Broadwick Festival Premises licence · in force Hours not given on the register

Licensed hours are what the licence permits, not opening times.

Site constraints 8

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Newham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 516 m away: Thames Tideway Tunnel
The site is 516 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: Silvertown Tunnel (decided, 833 m); London Strategic Heat Main Project (at pre-application, 1488 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
1 listed building within 150 m; Inside the Newham built-up area; Public transport access: PTAL 2 (poor), TfL 2023, for the 100 m square.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Newham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Newham
Application type
Listed Building Consent
Postcode
E16 1UR
Received
13 Apr 2026
Validated
13 Apr 2026
Ward
Royal Victoria
Parish
Royal Docks Community Forum
Case officer
Show
Decision
Approve
Decision date
14 Jul 2026
Decision level
Delegated decision
Applicant
Show
Agent
Avison Young

How this decision compares

Decided in 92 days from validation, 36 days slower than Newham's median of 56 for commercial and major works. Approved, as 83% of commercial and major works here are.

59%decided within 8 weeks
83%approved
33decided in the last year

Plota live figures for commercial and major works decided by Newham in the last twelve months, from validation. Newham decision record →

Consultation & key dates

Env. assessment
No
Newham
Planning Authority Score
3.7/10
Below average
#211 of 296 councils
Relevant to this application:
Other decisions

Newham ranks #191 out of 296 councils for householder decision speed. Householder applications are slightly less likely to be approved here (87%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Newham decision statistics
Based on MHCLG data, the year to March 2026
83%
Overall approval rate
Below avg (87%) #239 of 296
87%
Householder approved
Below avg (90%) #233 of 296
59%
Decided in 8 weeks
Below avg (63%) #191 of 296
39%
Extended time limit
Below avg (41%) #140 of 296
51%
Minor dwellings approved
67 decided (1-9 homes)
100%
Major dwellings approved
2 decided (10+ homes)
59%
Change of use approved
51 decided
989
Total decisions