Silvertown Quays Bounded By Royal Victoria Dock Connaught Bridge And Mill Road, North Woolwich Road… Data via plota.co.uk

PA/25/01122/NC - Observations to Other Authorities Decided

Proposal

Observation requested by London borough of Newham for Hybrid Planning Application for a phased mixed-use development comprising up to 885,000sqmGEA of floorspace and site wide Enabling Works (incl demolition, utility works, dock wall works and associated works): 1. Detailed Component. Site-wide Enabling Works and: i. 442residential units (Use Class C3) and 78,440sqmGEA of flexible nonresidential floorspace including Use Classes E, F1, F2 and Sui Generis (Drinking Establishments and Hot Food Takeaway); in buildings ranging from 2 to 13 storeys above ground; public open space, construction of estate roads and new accesses to the public highway, cycle and car parking, public realm works, the alteration, partial demolition and conversion of Millennium Mills and associated works; ii. site reclamation/dock infill works to Pontoon Dock; iii. Temp Energy Centre; iv. Temp Construction Site Welfare Building on Pontoon Dock. 2. Outline Component (all matters reserved): comprising up to683,816 sqm GEA Residential (Use Class C3) floorspace (circa. 6,730dwellings) and flexible non-residential floorspace up to 97,892sqmGEA incl Use Classes E, B8, C1, F1, F2 and Sui Generis (Drinking Establishments; Hot Food Takeaways; Live Music Venues; Theatres; Cinemas; Commercial Kitchen and Delivery Centres; and, Infrastructure); public open space, structures in, on, or over the dock area, construction of estate roads and new accesses to the public highway, cycle, motorcycle and car parking areas and associated access, public realm works, and associated works. This Application is for a phased development that will be capable of coming forward in distinct and separable phases and/or Plots in a severable way. This is a major application that affects the setting of listed buildings/structures and is accompanied by an Env. Statement for the purposes of Env. Impact Assessment (EIA) under the Town and Country Planning (EIA) Regulations 2017. Amendments to parameter plans, detailed design of Phases 1.1D, 1.2D and 1.9 and site wide affordable housing. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 23 Jun 2025
Decision
Target date was 14 Jul 2025

Under consideration

No decision has been issued yet. Plota predicted a decision around 18 Nov 2026; it is now day 513.

Site constraints 7

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Newham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project about 592 m away: Thames Tideway Tunnel
The site is about 592 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: Silvertown Tunnel (decided, about 700 m); London Strategic Heat Main Project (at pre-application, about 1597 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Inside the Newham built-up area; Public transport access: PTAL 2 (poor), TfL 2023, for the 100 m square.
Not affected
Not green belt · No scheduled monument at the site

Checked on 13 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Tower Hamlets - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Observations to Other Authorities
Postcode
E16 1UR
Received
around 23 Jun 2025
Validated
23 Jun 2025
Case officer
Show
Target decision
14 Jul 2025
Decision level
Delegated
Applicant
Show

Decision outlook

Day 513, past the statutory target. 84% of other in Tower Hamlets are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 14 Nov 2026.

Day 513457 days past the 56-day target
65%decided within 8 weeks
95%approved
2,215decided in the last year

Plota live figures for other decided across the UK in the last twelve months, from validation; too few recent other in Tower Hamlets to go on. Tower Hamlets decision record →

Consultation & key dates

Statutory expiry
14 Jul 2025
Env. assessment
No
Tower Hamlets
Planning Authority Score
3.9/10
Below average
#201 of 296 councils
Relevant to this application:
Householder decisions

Tower Hamlets is slower than most councils at deciding householder applications, ranking #207 out of 296. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Tower Hamlets decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #229 of 296
92%
Householder approved
Above avg (90%) #167 of 296
56%
Decided in 8 weeks
Below avg (63%) #207 of 296
42%
Extended time limit
Above avg (41%) #167 of 296
63%
Minor dwellings approved
52 decided (1-9 homes)
80%
Major dwellings approved
15 decided (10+ homes)
55%
Change of use approved
67 decided
998
Total decisions
164 refused in the year to March 2026