Parish's House, Hook, Timsbury, Bath, BA2 0ND Data via plota.co.uk

26/04252/TPO - Tree Works subject to TPO Pending Consideration

Proposal

T1- Ash tree, pollard to 12ft below the damage caused by the two trees rubbing. T2- Elm tree, pollard to 12ft below the damage caused by the two trees rubbing. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
2 Nov 2026
Decision
Expected by 28 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 8 Dec 2026, from Bath's recent tree and landscaping works.

Site constraints 6

3 listed buildings within 150 m of the postcode pin
Nearest: Parish's House, Grade II*, about 14 m from the postcode pin · 1 Grade II*, 2 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 3 with distances
Historic England ↗
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
Coalfield, development low risk area; Inside the Timsbury (Bath and North East Somerset) built-up area; Priority habitat about 34 m away: Deciduous woodland; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 11 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Bath - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Bath
Application type
Tree Works subject to TPO
Postcode
BA2 0ND
Received
2 Nov 2026
Validated
2 Nov 2026
Ward
Timsbury
Parish
Timsbury
Case officer
Show
Target decision
28 Dec 2026
Applicant
Show

Decision outlook

Day 21 of the 56-day target. Bath usually decides tree and landscaping works by day 36.

Day 2135 days to the 56-day target
99%decided within 8 weeks
100%approved
993decided in the last year

Plota live figures for tree and landscaping works decided by Bath in the last twelve months, from validation. Bath decision record →

Consultation & key dates

Planning Portal ref
PP-15339219
Bath
Planning Authority Score
4.8/10
Below average
#157 of 296 overall
Relevant to this application:
Householder decisions

Bath is slower than most councils at deciding householder applications: #236 of 296 on speed. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Bath decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #17 of 296
97%
Householder approved
Above avg (90%) #26 of 296
50%
Decided in 8 weeks
Below avg (63%) #236 of 296
46%
Extended time limit
Above avg (41%) #199 of 296
87%
Minor dwellings approved
172 decided (1-9 homes)
86%
Major dwellings approved
7 decided (10+ homes)
85%
Change of use approved
26 decided
1,817
Total decisions
96 refused in the year to March 2026