44 St Marys Close Thorney Peterborough PE6 0SJ
Pending
26/002006/HHFUL - Householder (Full)
Description
Removal of existing decayed flat roof and replacement with 30° pitched roof unde
Nearby new applications
Historical activity at this location
20 nearby applications on record - archival context, not part of the live application.
Within ~100m
Nearby activity
2025
Land Off Sandpit Road Sandpit Road Thorney Peterborough
Discharge of condition C7 (bat and bird box scheme) pursuant to planning permission 21/01…
2023
Approved
Land Off Sandpit Road Sandpit Road Thorney Peterborough
Variation of S106 Agreement of 21/01796/FUL
2023
Withdrawn
Land West Of Sandpit Road Sandpit Road Thorney Peterborough
Discharge of condition C11 (road construction) of planning permission reference 21/01796/…
2023
Approved
Land West Of Sandpit Road Sandpit Road Thorney Peterborough
Discharge of condition C3 (soft landscaping scheme), C10 (estate management and maintenan…
2023
Approved
Land Off Sandpit Road Sandpit Road Thorney Peterborough
Discharge of condition C21 (internal/external configuration of plots) and C22 (details of…
2023
Approved
Land West Of Sandpit Road Sandpit Road Thorney Peterborough
Discharge of conditions C6 (Environmental Management Plan) and C13 (Construction Manageme…
2023
Approved
Land West Of Sandpit Road Sandpit Road Thorney Peterborough
Discharge of condition C14 (Green Travel Plan) of planning permission 21/01796/FUL
2023
Approved
Land West Of Sandpit Road Sandpit Road Thorney Peterborough
Discharge of condition C5 (external lighting) of planning permission 21/01796/FUL
2023
Approved
Land West Of Sandpit Road Sandpit Road Thorney Peterborough
Discharge of condition C16 (archaeological investigations report) of planning permission…
2021
Approved
Land Off Sandpit Road Sandpit Road Thorney Peterborough
Construction of 68 dwellings and associated infrastructure
2021
Approved
Land West Of Sandpit Road Sandpit Road Thorney Peterborough
Non material amendment (change in location of pedestrian footpath at road frontage of sit…
2020
Approved
Land West Of Sandpit Road Sandpit Road Thorney Peterborough
Discharge of condition C10 (Contured plans) on outline permission 16/00160/OUT
2020
Approved
Land West Of Sandpit Road Sandpit Road Thorney Peterborough
Non-material amendment (to regularise the finished floor levels with the drainage strateg…
2019
Approved
Land West Of Sandpit Road Sandpit Road Thorney Peterborough
Discharge of conditions C7 (Drainage), C14 (Travel Plan), C15 (Hard and soft landscaping)…
2020
Approved
Land West Of Sandpit Road Sandpit Road Thorney Peterborough
Non-material amendment (roof tiles on 15 plots and associated garages) of planning permis…
2019
Approved
Land West Of Sandpit Road Sandpit Road Thorney Peterborough
Non material amendment (regularise the planning layout with the drainage and highways str…
2019
Approved
Land West Of Sandpit Road Sandpit Road Thorney Peterborough
Discharge of conditions C12 (Bird and Bat Box Locations). C13 (Water Vole Survey). C18 (E…
2019
Approved
Land Off Sandpit Road Sandpit Road Thorney Peterborough
Discharge of conditions C9 (foul water scheme) and C10 (contoured plans and sections) of…
2018
Approved
Land Off Sandpit Road Sandpit Road Thorney Peterborough
Approval of appearance, landscaping, layout and scale for 91 dwellings pursuant to outlin…
2016
Approved
Land West Of Sandpit Road Sandpit Road Thorney Peterborough
Residential development to provide up to 91no dwellings with associated access from Wisbe…
Peterborough
Planning Authority Score
5.2/10
Average
#137 of 292 councils
Relevant to this application:
Householder decisions
Peterborough ranks #155 out of 292 councils for householder decision speed. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).
These figures are council-wide context, not a prediction for this application.
View full council performance
Peterborough decision performance
Based on MHCLG data, 2025
84%
Overall approval rate
Below avg (87%) #223 of 292
89%
Householder approved
Below avg (90%) #207 of 292
64%
Decided in 8 weeks
Above avg (64%) #155 of 292
31%
Extended time limit
Below avg (40%) #63 of 292
70%
Minor dwellings approved
46 decided (1-9 homes)
63%
Major dwellings approved
19 decided (10+ homes)
65%
Change of use approved
74 decided
706
Total decisions
116 refused in 2025
