Search Peterborough City Council planning applications

See all 18,894 planning applications since 2016, 369 in the last 90 days, from Peterborough City Council across 26 towns and areas and 9 postcode districts. Search and filter them by date, status, development type or number of homes, see the latest on the map, or get a free alert for new applications. In the year to March 2026, Peterborough City Council decided 665 planning applications and approved 83%; 67% of householder decisions were made within eight weeks.

Date received
Get alerts for Peterborough

Source: Peterborough City Council·Updated daily·Last checked 22 Nov 2026

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application typeAny
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 50 of 369 applications
2 days ago Awaiting Allocation 26/003199/WCPP

337, Thorpe Road, Peterborough, PE3 6LU

26/002752/HHFUL - Variation of condition C2 (plans)

Without Compliance (Planning Permission)
19 Nov 2026 Awaiting Allocation 26/003165/FUL

5 Church Street Peterborough PE1 1XB

Installation of defibrillator and bleed kit cabinets to external wall

Planning Application (Full)
19 Nov 2026 Awaiting Allocation 26/003091/LBC

3 Wisbech Road Thorney Peterborough PE6 0SA

Replace windows and doors in white. Current brown window frames rotten.

Listed Building Consent
19 Nov 2026 Awaiting Allocation 26/002868/HHFUL

31 Westwood Park Road Peterborough PE3 6JL

Two storey side extension and single storey rear extension

Householder (Full)
19 Nov 2026 Allocated 26/003195/HHFUL

Ferry House Milton Park Peterborough PE6 7AB

Renovation and Extension of the Ferry House

Householder (Full)
19 Nov 2026 Allocated 26/003167/FUL

O'Neills, Broadway, Peterborough, PE1 1SQ

Installation of 3no. Air Conditioning Units

Planning Application (Full)
18 Nov 2026 Awaiting Allocation 26/003204/DISCHG

Former Cherry Tree Pub, 9 Oundle Road Woodston Peterborough

25/00416/FUL - Discharge of condition C8 (soft landscaping scheme)

Compliance with Planning Condition(s)
18 Nov 2026 Awaiting Allocation 26/003163/FUL

26 Northminster Peterborough PE1 1YN

Relocation of the front entrance

Planning Application (Full)
18 Nov 2026 Allocated 26/003201/HHFUL

5, Reeves Way, Peterborough, PE1 5LF

Two storey side and rear extension, single storey rear extension and front canopy

Householder (Full)
18 Nov 2026 Allocated 26/003200/PRIOR

246, Park Road, Peterborough, PE1 2UR

Single storey rear extension Maximum length from original rear wall: 6m Maximum height: 3m (to eaves: 3m)

Prior Approval
18 Nov 2026 Allocated 26/003193/HHFUL

18 Westwood Park Road Peterborough PE3 6JL

Single storey side extension and reinstate crossing to full kerb height

Householder (Full)
18 Nov 2026 Allocated 26/003197/TRE

17 Bishops Walk Barnack Stamford PE9 3EE

T.1 - lime - remove deadwood T.2 - lime - remove deadwood and raise crown to 5.5m

Conservation Area Trees Notification Peterborough
18 Nov 2026 Awaiting Allocation 26/003186/LBC

Midstone House Main Street Southorpe Stamford PE9 3BX

Proposed new carport

Listed Building Consent Peterborough
18 Nov 2026 Awaiting Allocation 26/003185/HHFUL

Midstone House Main Street Southorpe Stamford PE9 3BX

Proposed new carport

Householder (Full) Peterborough
18 Nov 2026 Awaiting Allocation 26/003184/FUL

343 Eagle Way, Peterborough, PE7 8GS

Change of use of site to permit use of site for class E(a) retail, Class E(c) barbers shop and alterations to shopfront to create 2 units - retrospect...

Planning Application (Full)
18 Nov 2026 Awaiting Allocation 26/003173/FUL

15a Ivatt Way, Peterborough, PE3 7PG

Erection of a single-storey workshop extension with two-storey office and welfare wing, re-cladding of the existing building, removal of the existing ...

Planning Application (Full)
17 Nov 2026 Allocated 26/003196/LBC

Ferry House Milton Park Peterborough PE6 7AB

Renovation and Extension of the Ferry House

Listed Building Consent
17 Nov 2026 Allocated 26/003191/FUL

Former Wilko Unit, 4-6 Hereward Cross Broadway Peterborough PE1 1TA

Alterations to the shopfront to create 2 new entrance doors

Planning Application (Full)
17 Nov 2026 Awaiting Allocation 26/003161/FUL

Peterborough Business Park, Lynch Wood, Peterborough PE2 6FY

Retrospective application for nine external padel courts, ancillary toilet block, reception and café block, seating and waiting area and associated fl...

Planning Application (Full)
17 Nov 2026 Allocated 26/003189/CTR

The Grange 15 Nene Way Sutton Peterborough PE5 7XD

Pollard 3no. Crack Willows along the riverside due to failed limbs and excessive

Conservation Area Trees Notification
17 Nov 2026 Allocated 26/003188/HHFUL

298 Dogsthorpe Road Peterborough PE1 3PL

Single storey side and rear and part first floor side and rear extension

Householder (Full)
17 Nov 2026 Allocated 26/003174/HHFUL

27 Mayfield Road Peterborough PE1 4HJ

Two storey side extension and single storey rear extension to dwelling with exi

Householder (Full)
16 Nov 2026 Awaiting Allocation 26/003178/ENQDIS

British Sugar Oundle Road Woodston Peterborough PE2 9AY

Confirmation all conditions have been discharged on planning application 19/00039/FUL

Enquiry - Discharged Conditions
16 Nov 2026 Allocated 26/003127/FUL

Maxey Nurseries, Mill Road, Maxey, Peterborough, PE6 9EZ

Demolition of existing buildings and development of 5 new residential dwellings

Planning Application (Full)
16 Nov 2026 Allocated 26/003046/PRIOR

69 Monarch Avenue Fletton Peterborough PE2 8SU

Single-story extension to semi detatched property Maximum length from original rear wall: 4m Maximum height: 3.3m (to eaves: 2.1m)

Prior Approval
16 Nov 2026 Allocated 26/003183/FUL

St Marys Church Church Lane Bainton Stamford PE9 3AQ

Installation of rainwater pipes to existing chutes

Planning Application (Full) Peterborough
16 Nov 2026 Allocated 26/003179/REM

Yard off English Drive (Little House Farm), Thorney

Reserved matters consent pursuant to outline planning permission 26/002300/OUT

Planning Application (Reserved Matters) Peterborough
16 Nov 2026 Withdrawn 20 Nov 26/003187/NONMAT

522 Oundle Road Orton Longueville Peterborough PE2 7DJ

25/00285/FUL - Non Material amendment to approved plot drawings for Plots 1, 2 and 3 (condition 2)

Non-Material Amendment
16 Nov 2026 Awaiting Allocation 26/003180/DISCHG

Land To The North Of Norman Cross London Road Peterborough

09/01368/OUT - Discharge of condition C30 (monitoring report) of outline permission 09/01368/OUT

Compliance with Planning Condition(s)
13 Nov 2026 Under Consultation 26/003177/DISCHG

Aqua Drive Hampton Leys Phorpres Way Cygnet Park Peterborough PE7 8TR

25/00529/REM - Discharge of condition C5 (maintenance arrangements) of reserved matters consent 25/00529/REM

Compliance with Planning Condition(s)
13 Nov 2026 Allocated 26/003175/DISCHG

George Farm London Road Wothorpe Stamford PE9 3JP

24/00961/FUL - Discharge of conditions C5 (details of works), C6 (wheelwashing facilities) and C12 (ground investigation report) of planning permissio...

Compliance with Planning Condition(s) Peterborough
12 Nov 2026 Allocated 26/003107/HHFUL

55 Beverstone Orton Brimbles Peterborough PE2 5YN

Proposed ground floor front extension

Householder (Full)
12 Nov 2026 Allocated 26/003176/PDNOT

East Of England Showground Oundle Road Alwalton Peterborough PE2 6XE

Proposed upgrade of an existing telecommunications base station comprising the removal of existing 15m column and replacement with new 25m column on e...

Permitted Development Notification
12 Nov 2026 Under Consultation 26/003170/DISCHG

Hampton Beach Peterborough

21/00960/REM - Part Discharge of condition C21 (Fire Hydrants)

Compliance with Planning Condition(s)
12 Nov 2026 Allocated 26/003125/NONMAT

Rightwell House, Rightwell East, Peterborough, PE3 8DW

24/01611/PRIOR - Non Material amendment (description amendment to read Conversion of office building to 70 apartments)

Non-Material Amendment
11 Nov 2026 Allocated 26/003137/FUL

Land Adjacent to Thistlemoor Medical Centre New England Peterborough

Retention of secure storage buildings

Planning Application (Full)
11 Nov 2026 Allocated 26/003171/ADV

Land at Thorpe Wood Peterborough

4no. fascia signs to the elevations of the building and 3no. wayfinding signage in the car park

Advertisement Application
11 Nov 2026 Allocated 26/003172/CTR

Barnack Village Hall School Road Barnack Stamford PE9 3DZ

Maple tree - Remove branches that overhang carpark as not to present a risk to people and vehicles

Conservation Area Trees Notification Peterborough
11 Nov 2026 Allocated 26/003157/HHFUL

7, Francis Gardens, Peterborough, PE1 3XX

Two storey side, single storey rear extension and front canopy

Householder (Full)
11 Nov 2026 Pending Consideration 26/003160/PDNOT

Torpel Way Maxey Peterborough

Installation of fixed line broadband electronic communications apparatus under Regulation 5

Permitted Development Notification
11 Nov 2026 Allocated 26/003158/HHFUL

147, Chestnut Avenue, Peterborough, PE1 4NT

Single storey rear extension

Householder (Full)
11 Nov 2026 Under Consultation 26/003156/HHFUL

12A, Hall Lane, Peterborough, PE4 6RA

Replacement of existing rear structure and erection of single storey extention

Householder (Full)
11 Nov 2026 Under Consultation 26/003141/DISCHG

Lindra Main Street Southorpe Stamford PE9 3BX

26/002803/WCPP - Discharge of condition C8 (hard landscaping scheme) of planning permission 26/002803/WCPP

Compliance with Planning Condition(s) Peterborough
11 Nov 2026 Allocated 26/003143/HHFUL

4 Musa Drive Werrington Peterborough PE4 7SA

Conversion of existing garage to a home office ancillary to the main dwelling

Householder (Full)
10 Nov 2026 Allocated 26/003181/LBC

Cross Roads School Road Barnack Stamford PE9 3DZ

Demolition and reconstruction of an existing stone retaining wall to facilitate

Listed Building Consent Peterborough
10 Nov 2026 Allocated 26/003169/HHFUL

Cross Roads School Road Barnack Stamford PE9 3DZ

Demolition and reconstruction of an existing stone retaining wall to facilitate

Householder (Full) Peterborough
10 Nov 2026 Allocated 26/003168/DISCHG

Pond House The Park Wisbech Road Thorney Peterborough PE6 0SA

24/00221/FUL - Discharge of condition C7 (soft landscaping scheme)

Compliance with Planning Condition(s)
10 Nov 2026 Allocated 26/003159/FUL

709, Lincoln Road, Peterborough, PE1 3HD

Dormer on rear side of roof

Planning Application (Full)
10 Nov 2026 Allocated 26/003087/FUL

46 Broadway Peterborough PE1 1RS

Replacement of the existing entrance doors to the link building between the New Theatre and 44 Broadway with new automatic sliding glazed doors and as...

Planning Application (Full)
10 Nov 2026 Allocated 26/003086/FUL

46 Broadway Peterborough PE1 1RS

Renewal and upgrading of the Theatre’s mechanical services and air handling, including installation of four roof-level air source heat pumps on a galv...

Planning Application (Full)
Recency
Last 2 weeks
2-4 weeks
1–2 months
Older

Get free email alerts for new planning applications in Peterborough

All towns and areas in Peterborough (26)
Bainton (Peterborough)BarnackBorough FenCastorCastor and AilsworthDeeping St JamesEtton (Peterborough)Eye (Peterborough)GlintonHelpstonMarholmMaxeyNewborough (Peterborough)NorthboroughOrton LonguevillePeakirkSouthorpeSt. Martin's WithoutSutton (Peterborough)ThorneyThornhaughUfford (Peterborough)Upton (Peterborough)WansfordWitteringWothorpe
Postcode districts in Peterborough (9)
PE1PE2PE3PE4PE5PE6PE7PE8PE9

Decisions in Peterborough Full decision record →

52daysmedian to decide2 days faster than UK
68%decided within 8 weeks4 pts above UK
88%approved2 pts below UK
137of 389UK rank for speeddown 9 places on last year

1,437 decisions in the 12 months to October 2026 · fewer than 1% went to committee. Days run from validation to decision, the clock councils report against; Plota live figures.

Frequently asked questions

How long does Peterborough City Council take to decide a planning application?
Across the 1,437 applications Peterborough City Council decided in the last 12 months, the median time from validation to decision was 52 days, and 68% were decided within 8 weeks. The UK median over the same period is 54 days.
What proportion of planning applications does Peterborough City Council approve?
88% of the applications Peterborough City Council decided in the last 12 months were approved. Withdrawn applications are not counted as decisions.
Where does this planning application data come from?
Every application on this page comes from Peterborough City Council's public planning register (planning.agileapplications.co.uk). Plota collects it, adds a map location and a category, and links each record back to the council's own entry, which is the authoritative version.
How often is this page updated?
Plota checks Peterborough City Council's register every day and adds new applications, status changes and decisions as the council publishes them. The register was last checked on 22 Nov 2026.
Where can I see the plans and documents for an application?
Plans, drawings and officer reports are held on Peterborough City Council's own website. Where the council publishes a document list, it appears on the application's page here with each item linking to the council's copy; otherwise the "View original council record" link on every application opens the council's entry.

About this data

Plota holds 18,894 planning applications from Peterborough City Council since 2016, each counted once: 2,056 current records, received since 3 Feb 2023, and 16,838 earlier ones in the Plota archive, searchable by location and keyword. 369 were received in the last 90 days. Current records are collected from the council's public register at planning.agileapplications.co.uk and checked every day; the last check was on 22 Nov 2026. Each record carries the council's reference, address, proposal, dates, status and decision, with a map location and Plota's classification by type and procedure added. The council's own record is the authoritative version; every entry here links to it.

Latest application from Peterborough: 20 Nov 2026. We check the council's portal daily.