Tir Yn Ger / Land By LL23 7NR, Frongoch, LL23 7NR Data via plota.co.uk

C24/1032/04/LL - Full Planning Approved

Proposal

Gweithrediad dros dro o fast meteorolegol a strwythurau ategol am gyfnod o hyd at bum mlynedd Temporary operation of a meteorological mast and ancillary structures for a period of up to five years. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
26 Nov 2024
✓
Validated
28 Nov 2024
✓
Committee
13 Jul 2026
✓
Approved
15 Jul 2026

Approved on 15 Jul 2026 · Pwyllgor Cynllunio / Planning Committee · Last checked 1 Oct 2026

Planning committee

Decided by Gwynedd Planning Committee on 13 Jul 2026.

Approved

As officers recommended.

  • Officers advised approval because the temporary, slender mast could operate without unacceptable landscape, ecological or residential impacts, subject to conditions.
  • A resident objected over landscape harm, lighting, visibility and possible effects on property value; consultees mainly accepted mitigation or raised no objection.
  • Members noted the conditions and concerns about future wind-farm infrastructure before agreeing to approve by resolution.
Read how the committee decided The proposal, site history, officers’ assessment, consultation responses, objections, member discussion, conditions and decision.

Source: Plota analysis of Gwynedd's committee minutes of 13 Jul 2026.

Documents 15

All documents on the council site ↗

Site constraints 3

Nutrient neutrality catchment: River Dee
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Agricultural land, grade 4
Poor quality farmland, not best and most versatile. Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Also on the record
National park about 472 m away: Snowdonia.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 18 September 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Gwynedd - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Gwynedd
Application type
Full Planning
Postcode
LL23 7NR
Received
26 Nov 2024
Validated
28 Nov 2024
Ward
Llandderfel
Parish
Llandderfel
Case officer
Show
Target decision
15 Jul 2026
Decision
Approved with Conditions
Decision date
15 Jul 2026
Decision level
Pwyllgor Cynllunio / Planning Committee
Applicant
Show
Agent
Foel Fach Wind Farm Limited

How this decision compares

Decided in 594 days from validation, 432 days slower than Gwynedd's median of 162 for full applications. Approved, as 84% of full applications here are.

14%decided within 8 weeks
84%approved
12%go to committee

Plota live figures for full applications decided by Gwynedd in the last twelve months, from validation. Gwynedd decision record →

Consultation & key dates

Comments by
19 Mar 2026
Statutory expiry
15 Jul 2026