Land 3Km SW Of Wester Lealty At Cnoc Ceislain Novar Evanton
Under Consideration
26/01226/S36
Description
Ceislein Wind Farm - Erection and operation of a wind farm for a period of 40 years, comprising up to 11 wind turbines with a maximum blade tip height of 250m, (8 turbines at 250m Nos. T3 through to T10, and 3 turbines at 200m, Nos T1, T2 and T11), Battery Energy Storage System, access tracks, borrow pits, substation, control building, and ancillary infrastructure. This case will be determined by the Energy Consents Unit. Please visit Energy Consents Unit at https://www.energyconsents.scot/ApplicationSearch.aspx?T=2 using reference number ECU00005174
Nearby new applications
Historical activity at this location
7 nearby applications on record - archival context, not part of the live application.
Within ~100m
Nearby activity
2025
Approved
The Co-operative 13 Balconie Street Evanton Dingwall IV16 9UN
Installation of 2no. AC units, 1no. condensing unit and erection of wall
2025
Approved
Land 20M North Of 3 Sgitheach Place Sgitheach Place Evanton
Erection of toilet block
2023
Approved
Vacant Area Of Land 4 Chapel Road Evanton
Siting of hot food van (retrospective)
2022
Withdrawn
Land 35M West Of 9 Balconie Street Balconie Street Evanton
Erection of house
2022
Approved
Post Office House Chapel Road Evanton Dingwall IV16 9XT
Change of Use of former Post Office to form part of existing dwelling
2016
Approved
17 Balconie Street Evanton
Change of use and alterations to building to form two houses (amended plans to planning p…
2016
Approved
13 Balconie Street Evanton Dingwall IV16 9UN
Erection of wall to form storage area, installation of condenser unit and installation of…