Salcombe Hill Salcombe Hill Road Sidmouth Data via plota.co.uk

26/1766/FUL - Full Application Awaiting decision

Proposal

Create a new section of accessible permissive path at Salcombe Hill to restore a circular route that was lost following a landslide in 2024 Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 21 Sept 2026
Decision
Target date was 16 Nov 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 18 Nov 2026; it is now day 58.

Site constraints 10

East Devon National Landscape
Great weight to conserving the landscape; major development restricted.
Previously an area of outstanding natural beauty, which is still the designation in law. Since 2023 authorities must seek to further its purpose, not merely have regard to it.
Heritage coast: East Devon
A defined stretch of undeveloped coastline.
Development inconsistent with keeping the coast undeveloped is resisted.
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Public footpath 22 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Kingswear to Lyme Regis 16 m away
Matters where it crosses or adjoins the site; the route and its margin are protected.
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Special area of conservation 294 m away: Sidmouth to West Bay
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Also on the record
SSSI 294 m away: Sidmouth to Beer Coast SSSI; Radon affected area, class 4; Priority habitat 26 m away: Lowland dry acid grassland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Devon - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
East Devon
Application type
Full Application
Received
around 21 Sept 2026
Validated
21 Sept 2026
Ward
Sidmouth Rural
Parish
Sidmouth
Applicant
Show

Decision outlook

Day 58, past the statutory target. 99% of tree and landscaping works in East Devon are decided within thirteen weeks, which runs to 21 Dec 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 12 Nov 2026.

Day 582 days past the 56-day target
89%decided within 8 weeks
94%approved
380decided in the last year

Plota live figures for tree and landscaping works decided by East Devon in the last twelve months, from validation. East Devon decision record →

Public comments

1comment received
1 supporting

1 neighbour consulted · Last counted 12 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15129709
Planning Portal ref
PP-15129709
Site or press notice
30 Sept 2026
Env. assessment
No
East Devon
Planning Authority Score
6.7/10
Good
#72 of 296 councils
Relevant to this application:
Householder decisions

East Devon ranks #103 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
East Devon decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #152 of 296
94%
Householder approved
Above avg (90%) #104 of 296
72%
Decided in 8 weeks
Above avg (63%) #103 of 296
34%
Extended time limit
Below avg (41%) #86 of 296
63%
Minor dwellings approved
168 decided (1-9 homes)
74%
Major dwellings approved
23 decided (10+ homes)
88%
Change of use approved
25 decided
1,321
Total decisions
157 refused in the year to March 2026