Electricity Substation To The East Of High West House Farm Hedleyhill Lane Tow Law DL13 4DE Data via plota.co.uk

DM/26/00231/FPA - Full Planning Application Approved

Proposal

Retention of the existing electricity substation and associated infrastructure (including hardstanding and access track), and relocation of a transformer housing unit, to allow the continued operation of High Hedley Wind Farm permitted under reference . Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
29 Jan 2026
✓
Validated
30 Jan 2026
✓
Consultation
10 Feb 2026
✓
Approved
30 Apr 2026

Approved on 30 Apr 2026 · Full Delegated · Last checked 2 Aug 2026

Associated applications 2

Site constraints 5

Coal mining development high risk area
Recorded coal mining features at or near the surface. Most planning applications here need a coal mining risk assessment.
From the Mining Remediation Authority, formerly the Coal Authority. The development high risk area marks recorded coal mining features at or near the surface: mine shafts and adits, shallow workings, mine gas and former opencast sites. Most planning applications there need a coal mining risk assessment; householder applications, changes of use and some minor works are exempt. Mine entry positions come from old plans and can be out by several metres, and unrecorded workings can exist anywhere in the coalfield.
Coal mining risk assessments ↗
Agricultural land, grade 4
Poor quality farmland, not best and most versatile. Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 2; Open access land 17 m away: Access Land - Combined Open Country, Registered Common Land and Section 16 Dedicated Land.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Looking for land for a wind farm?

Plota Sites searches every land parcel in England and Wales: 8,347 sites fit this search. On and off the market, free to search.

Land for wind farms
Work with planning data?

Every application in Durham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Durham
Application type
Full Planning Application
Postcode
DL13 4DE
Received
29 Jan 2026
Validated
30 Jan 2026
Ward
Deerness
Parish
Hedleyhope
Case officer
Show
Target decision
27 Mar 2026
Decision
Approved BNG Not Required
Decision date
30 Apr 2026
Decision level
Full Delegated
Applicant
Show

How this decision compares

Decided in 90 days from validation, 34 days slower than Durham's median of 56 for utility and infrastructure works. Approved, as 92% of utility and infrastructure works here are.

63%decided within 8 weeks
92%approved
7%go to committee

Plota live figures for utility and infrastructure works decided by Durham in the last twelve months, from validation. Durham decision record →

Public comments

No public comments yet.

Last counted 2 Aug 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14659466
Planning Portal ref
PP-14659466
Consultation
10 Feb 2026
Comments by
24 Mar 2026
Site or press notice
3 Mar 2026
Statutory expiry
27 Mar 2026
Env. assessment
No
Durham
Planning Authority Score
5.2/10
Average
#137 of 296 overall
Relevant to this application:
Householder decisions

Durham is #190 of 296 councils on householder decision speed. 48% of applications have the time limit extended, above the 41% national average. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Durham decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #52 of 296
97%
Householder approved
Above avg (90%) #29 of 296
59%
Decided in 8 weeks
Below avg (63%) #190 of 296
48%
Extended time limit
Above avg (41%) #213 of 296
79%
Minor dwellings approved
95 decided (1-9 homes)
90%
Major dwellings approved
49 decided (10+ homes)
87%
Change of use approved
201 decided
1,706
Total decisions
113 refused in the year to March 2026