TŶ MAWR, Botwnnog, Pwllheli, Gwynedd, LL53 7SS Data via plota.co.uk

C26/0002/30/LL - Full Planning In Progress

Proposal

Dymchwel yr annedd presennol a'r adeiladau allanol presennol ynghyd a'i ail-godi ac ail-leoli'r annedd y tu allan i'r Ardal Rheoli Newid Arfordirol ynghyd a mynediad, seilwaith, draenio a gwaith tirlunio cysylltiol / The demolition of the existing dwelling and associated outbuildings and the relocation and replacement of the dwelling outside of the Coastal Change Management Area, with associated access, infrastructure, drainage and landscaping works Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
5 Jan 2026
Decision
Target date was 11 Sept 2026

Under consideration

No decision has been issued yet. Plota predicted a decision soon after comments close on 17 Sept 2026; it is now day 322.

The consultation period closed on 17 Sept 2026.

Documents 66

Plans & drawings 46

PDF 18_08_2026-Disodli-Superseded-22_13_03_033-Attic-Floor-Plan-Proposed.pdf Plans · 18 Aug 2026 View ↗ PDF 18_08_2026-Cynllun-diwygiedig-Amended-plan-22_13_3_33C-Loft-Plan.pdf Plans · 18 Aug 2026 View ↗ PDF 10_08_2026-Cynllun-diwygiedig-Amended-plan-24245_102-DETAILED-LANDSCAPE-PROPOSALS-REV-D.pdf Supporting Documents · 17 Aug 2026 View ↗ PDF 10_08_2026-Cynllun-diwygiedig-Amended-plan-22_13_03_038-Outbuilding-4-Proposed.pdf Plans · 17 Aug 2026 View ↗ PDF 10_08_2026-Cynllun-diwygiedig-Amended-plan-22_13_03_037-Roof-Plan-Proposed.pdf Plans · 17 Aug 2026 View ↗ PDF 10_08_2026-Cynllun-diwygiedig-Amended-plan-22_13_03_035-Proposed-Walled-Parking-Bin-Store.pdf Plans · 17 Aug 2026 View ↗ PDF 10_08_2026-Cynllun-diwygiedig-Amended-plan-22_13_03_034-Elevations-Proposed.pdf Plans · 17 Aug 2026 View ↗ PDF 10_08_2026-Cynllun-diwygiedig-Amended-plan-22_13_03_032-First-Floor-Plan-Proposed.pdf Plans · 17 Aug 2026 View ↗ PDF 10_08_2026-Cynllun-diwygiedig-Amended-plan-22_13_03_031-Ground-Floor-Plan-Proposed.pdf Plans · 17 Aug 2026 View ↗ PDF 10_08_2026-Cynllun-diwygiedig-Amended-plan-22_13_03_028-Site-Sections-North-to-South-Proposed.pdf Plans · 17 Aug 2026 View ↗ PDF 10_08_2026-Cynllun-diwygiedig-Amended-plan-22_13_03_027-Site-Sections-West-to-East-Proposed.pdf Plans · 17 Aug 2026 View ↗ PDF 10_08_2026-Cynllun-diwygiedig-Amended-plan-22_13_03_026-Site-Sections-North-to-South-Existing.pdf Plans · 17 Aug 2026 View ↗ PDF 10_08_2026-Cynllun-diwygiedig-Amended-plan-22_13_03_024-Site-Sections-Proposed-Context.pdf Plans · 17 Aug 2026 View ↗ PDF 10_08_2026-Cynllun-diwygiedig-Amended-plan-22_13_03_023-Site-Sections-Existing-Context.pdf Plans · 17 Aug 2026 View ↗ PDF 10_08_2026-Cynllun-diwygiedig-Amended-plan-22_13_03_022-Site-Block-Plan-Proposed-Existing-Location.pdf Plans · 17 Aug 2026 View ↗ PDF 10_08_2026-Cynllun-diwygiedig-Amended-plan-22_13_03_021-Site-Block-Plan-Proposed-Relocation-Site.pdf Plans · 17 Aug 2026 View ↗ PDF 10_08_2026-Disodli-Superseded-24245_102-DETAILED-LANDSCAPE-PROPOSALS-REV-A.pdf Plans · 17 Aug 2026 View ↗ PDF 10_08_2026-Disodli-Superseded-22_13_03_038-Outbuilding-4-Proposed.pdf Plans · 17 Aug 2026 View ↗ PDF 10_08_2026-Disodli-Superseded-22_13_03_037-Roof-Plan-Proposed.pdf Plans · 17 Aug 2026 View ↗ PDF 10_08_2026-Disodli-Superseded-22_13_03_035-Proposed-Garage-and-Bin-Store.pdf Plans · 17 Aug 2026 View ↗ PDF 10_08_2026-Disodli-Superseded-22_13_03_034-Elevations-Proposed.pdf Plans · 17 Aug 2026 View ↗ PDF 10_08_2026-Disodli-Superseded-22_13_03_032-First-Floor-Plan-Proposed.pdf Plans · 17 Aug 2026 View ↗ PDF 10_08_2026-Disodli-Superseded-22_13_03_031-Ground-Floor-Plan-Proposed.pdf Plans · 17 Aug 2026 View ↗ PDF 10_08_2026-Disodli-Superseded-22_13_03_028-Site-Sections-North-to-South-Proposed.pdf Plans · 17 Aug 2026 View ↗ PDF 10_08_2026-Disodli-Superseded-22_13_03_027-Site-Sections-West-to-East-Proposed.pdf Plans · 17 Aug 2026 View ↗ PDF 10_08_2026-Disodli-Superseded-22_13_03_026-Site-Sections-North-to-South-Existing.pdf Plans · 17 Aug 2026 View ↗ PDF 10_08_2026-Disodli-Superseded-22_13_03_024-Site-Sections-Proposed-Context.pdf Plans · 17 Aug 2026 View ↗ PDF 10_08_2026-Disodli-Superseded-22_13_03_023-Site-Sections-Existing-Context.pdf Plans · 17 Aug 2026 View ↗ PDF 10_08_2026-Disodli-Superseded-22_13_03_022-Site-Block-Plan-Proposed-Existing-Location.pdf Plans · 17 Aug 2026 View ↗ PDF 10_08_2026-Disodli-Superseded-22_13_03_021-Site-Block-Plan-Proposed-Relocation-Site.pdf Plans · 17 Aug 2026 View ↗ PDF 24245_102-DETAILED-LANDSCAPE-PROPOSALS-REV-A.pdf Plans · 6 Jan 2026 View ↗ PDF 2025-12-02-TY-MAWR-LVIA-V3.pdf Plans · 6 Jan 2026 View ↗ PDF 22_13_03_025-Site-Sections-West-to-East-Existing.pdf Plans · 6 Jan 2026 View ↗ PDF 22_13_03_010-Brick-Outbuilding-Existing.pdf Plans · 6 Jan 2026 View ↗ PDF 22_13_03_009-Outbuilding-4-Existing.pdf Plans · 6 Jan 2026 View ↗ PDF 22_13_03_008-Outbuilding-3-Existing.pdf Plans · 6 Jan 2026 View ↗ PDF 22_13_03_007-Long-Barn-Existing-Elevation.pdf Plans · 6 Jan 2026 View ↗ PDF 22_13_03_006-Long-Barn-Existing-Floor-Plans.pdf Plans · 6 Jan 2026 View ↗ PDF 22_13_03_005-Outbuilding-1-Existing-Elevation.pdf Plans · 6 Jan 2026 View ↗ PDF 22_13_03_004-Outbuilding-1-Existing-Floor-Plan.pdf Plans · 6 Jan 2026 View ↗ PDF 22_13_03_003-Main-Farmhouse-Existing-Elevation.pdf Plans · 6 Jan 2026 View ↗ PDF 22_13_03_002-Main-Farmhouse-Existing-Floor-Plan.pdf Plans · 6 Jan 2026 View ↗ PDF 22_13_03_001b-Site-Block-Plan-Existing-Relocation-Site.pdf Plans · 6 Jan 2026 View ↗ PDF 22_13_03_001a-Existing-Site-Plan-Existing-Buildings.pdf Plans · 6 Jan 2026 View ↗ PDF 22_13_03_000-Location-Plan-Existing.pdf Plans · 6 Jan 2026 View ↗ PDF 22_13_03_001a-Existing-Site-Plan-Existing-Buildings.pdf Plans · 6 Jan 2026 View ↗

Other documents 15

PDF planning/uploads/851651041794837870:: ::C26 0002 30 LL sylwadau polisi pellach Saesneg General Correspondence · 16 Nov 2026 View ↗ PDF 25_08_26-Ymateb-i-sylwadau-draenio.pdf Supporting Documents · 4 Sept 2026 View ↗ PDF 10_08_2026-Gwybodaeth-Ychwanegol-Additional-information-2026-08-05-TY-MAWR-LVA-ADDENDUM-V3.pdf Supporting Documents · 17 Aug 2026 View ↗ PDF 10_08_2026-Gwybodaeth-Ychwanegol-Additional-information-22_13-Ty-Mawr-DAS-Addendum-August-2026.pdf Supporting Documents · 17 Aug 2026 View ↗ PDF 67087-Ty-Mawr-Covering-Letter-Full-Application-05_01_26.pdf Supporting Documents · 6 Jan 2026 View ↗ PDF 22_13-Ty-Mawr-DAS-Dec-2025-13-18-Part-3-of-3.pdf Supporting Documents · 6 Jan 2026 View ↗ PDF 22_13-Ty-Mawr-DAS-Dec-2025-9-12-Part-2-of-3.pdf Supporting Documents · 6 Jan 2026 View ↗ PDF 22_13-Ty-Mawr-DAS-Dec-2025-1-8-Part-1-of-3.pdf Supporting Documents · 6 Jan 2026 View ↗ PDF Ty-Mawr-site-of-new-dwelling-Porth-Neigwl-PEA-Report.pdf Supporting Documents · 6 Jan 2026 View ↗ PDF SuDS-STRATEGY-02_12_2025-2a-FIXED.pdf Supporting Documents · 6 Jan 2026 View ↗ PDF P24754-R1-Ty-Mawr-Geomorphology-May-2024-31-50-Part-5-of-5.pdf Supporting Documents · 6 Jan 2026 View ↗ PDF P24754-R1-Ty-Mawr-Geomorphology-May-2024-26-30-Part-4-of-5.pdf Supporting Documents · 6 Jan 2026 View ↗ PDF P24754-R1-Ty-Mawr-Geomorphology-May-2024-24-25-Part-3-of-5.pdf Supporting Documents · 6 Jan 2026 View ↗ PDF P24754-R1-Ty-Mawr-Geomorphology-May-2024-23-Part-2-of-5.pdf Supporting Documents · 6 Jan 2026 View ↗ PDF P24754-R1-Ty-Mawr-Geomorphology-May-2024-1-22-Part-1-of-5.pdf Supporting Documents · 6 Jan 2026 View ↗

All documents on the council site ↗

Site constraints 5

Llyn National Landscape
Great weight to conserving the landscape; major development restricted.
Previously an area of outstanding natural beauty, which is still the designation in law. Since 2023 authorities must seek to further its purpose, not merely have regard to it.
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Special area of conservation 110 m away: Clogwyni Pen Llyn / Seacliffs of Lleyn
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
SSSI 110 m away: Porth Ceiriad, Porth Neigwl ac Ynysoedd Sant Tudwal
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Also on the record
Radon affected area, class 4.
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 3 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Gwynedd - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Gwynedd
Application type
Full Planning
Postcode
LL53 7SS
Received
5 Jan 2026
Validated
5 Jan 2026
Ward
Pen draw Llyn
Parish
Aberdaron
Case officer
Show
Target decision
11 Sept 2026
Decision level
Dirprwyedig / Delegated
Applicant
Show
Agent
Lichfields

Decision outlook

Day 322, past the statutory target. 48% of demolitions in Gwynedd are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 22 Nov 2026.

Day 322266 days past the 56-day target
23%decided within 8 weeks
94%approved
10%go to committee

Plota live figures for demolitions decided by Gwynedd in the last twelve months, from validation. Gwynedd decision record →

Consultation & key dates

Comments by
17 Sept 2026
Statutory expiry
11 Sept 2026