Pepperpot Nursery Selborne Road Selborne Alton Hampshire GU34 3HL Data via plota.co.uk

SDNP/26/03100/APNB - Agricultural Prior Notification Building Approved

Proposal

Prior Approval for the Construction of 4 x Polytunnels. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
7 Aug 2026
✓
Approved
21 Aug 2026

Approved on 21 Aug 2026 · LA Delegated Decision · Last checked 22 Aug 2026

Site constraints 5

South Downs National Park
The park authority decides applications here. Great weight to conserving the landscape; major development restricted.
Landscape, scenic beauty and wildlife carry great weight, and major development is only allowed in exceptional circumstances.
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 2. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 296 m away: Southampton to London Pipeline Project
The site is 296 m from the project boundary. Pipeline, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in South Downs - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Agricultural Prior Notification Building
Postcode
GU34 3HL
Received
7 Aug 2026
Validated
7 Aug 2026
Ward
Four Marks & Medstead Ward
Parish
Chawton Parish Council
Case officer
Show
Target decision
3 Sept 2026
Decision
Raise No Objection
Decision date
21 Aug 2026
Decision level
LA Delegated Decision
Applicant
Show

How this decision compares

Decided in 14 days from validation, 11 days faster than South Downs's median of 25 for agricultural works. Approved, as 79% of agricultural works here are.

85%decided within 8 weeks
79%approved
57decided in the last year

Plota live figures for agricultural works decided by South Downs in the last twelve months, from validation. South Downs decision record →

Public comments

No public comments yet.

Last counted 22 Aug 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15140759
Planning Portal ref
PP-15140759
Statutory expiry
3 Sept 2026
Env. assessment
No