11A Cross Chapel Street Headingley Leeds LS6 3JE Data via plota.co.uk

26/06458/TR - Tree Works Current

Proposal

T1 - willow tree to remove from the rear garden causing damage to a wall. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 16 Nov 2026
Decision
Expected by 24 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 4 Dec 2026 and 18 Dec 2026, from Leeds's recent tree and landscaping works.

Site constraints 7

Headingley conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Article 4 direction
A4D01. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
14 listed buildings within 150 m
Nearest: Ivy Cottage, Grade II, 23 m away · 14 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 14 with distances
Historic England ↗
Also on the record
Radon affected area, class 3; National infrastructure project: Calderdale Energy Park, at pre-application; Coalfield, development low risk area; Inside the Leeds (Leeds) built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 17 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area84 m² (904 sq ft)
Energy ratingC (72 out of 100), could reach B
PropertyEnclosed mid-terrace house, 5 habitable rooms
Built1900 to 1929
HeatingBoiler and radiators, mains gas
WallsSandstone or limestone, with internal insulation

From the energy performance certificate lodged in February 2018, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in Leeds - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Leeds
Application type
Tree Works
Postcode
LS6 3JE
Received
around 16 Nov 2026
Validated
16 Nov 2026
Ward
Headingley & Hyde Park
Target decision
24 Dec 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Oakwood Tree Service

Decision outlook

Day 7 of the 56-day target. Leeds usually decides tree and landscaping works by day 25.

Day 749 days to the 56-day target
96%decided within 8 weeks
90%approved
1,042decided in the last year

Plota live figures for tree and landscaping works decided by Leeds in the last twelve months, from validation. Leeds decision record →

Public comments

No public comments yet.

Last counted 17 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
24 Dec 2026
Env. assessment
No
Leeds
Planning Authority Score
5.3/10
Average
#131 of 296 overall
Relevant to this application:
Householder decisions

Leeds is faster than most councils at deciding householder applications: #95 of 296 on speed. Householder applications are slightly less likely to be approved here (85%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Leeds decision statistics
Based on MHCLG data, the year to March 2026
83%
Overall approval rate
Below avg (87%) #238 of 296
85%
Householder approved
Below avg (90%) #249 of 296
73%
Decided in 8 weeks
Above avg (63%) #95 of 296
33%
Extended time limit
Below avg (41%) #78 of 296
70%
Minor dwellings approved
208 decided (1-9 homes)
86%
Major dwellings approved
36 decided (10+ homes)
68%
Change of use approved
279 decided
3,681
Total decisions
613 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.