Walkington Hall 27 Northgate Walkington East Riding Of Yorkshire HU17 8ST Data via plota.co.uk

26/02512/TPO - Works to Protected Trees Pending Consideration

Proposal

TPO - WALKINGTON -1972 (REF 262) - W1 1 no. Sycamore Tree Crown lift branches growing over the rear garden of 17 Hall Walk by 7 metres, 4 no. Sycamore Tree's Crown lift the side branches growing over the rear garden of 12 West End by 5 metres, to suppress any further complaints from the residents Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
22 Sept 2026
Decision
Expected by 17 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 28 Oct 2026, from East Riding's recent tree and landscaping works.

Comments are open until 16 Oct 2026

Comment on this application ↗

Site constraints 8

Walkington conservation area
Also Walkington. Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
National infrastructure project 1433 m away: Hornsea Project Four Offshore Wind Farm; 1 listed building within 150 m; Inside the Walkington built-up area; Priority habitat 29 m away: Deciduous woodland; Tree preservation order 29 m away: Walkington - 1972; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 2, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Energy ratingE (47 out of 100), could reach D
PropertyDetached house, 14 habitable rooms
BuiltBefore 1900
HeatingBoiler and underfloor heating, mains gas
WallsSolid brick, as built, no insulation (assumed)

From the energy performance certificate lodged in March 2015, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in East Riding - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Works to Protected Trees
Postcode
HU17 8ST
Received
22 Sept 2026
Validated
22 Sept 2026
Ward
Beverley Rural
Parish
Walkington Parish Council
Case officer
Show
Target decision
17 Nov 2026
Applicant
Show
Agent
AB Forestry

Decision outlook

Day 17 of the 56-day target. East Riding usually decides tree and landscaping works by day 36.

Day 1739 days to the 56-day target
94%decided within 8 weeks
97%approved
582decided in the last year

Plota live figures for tree and landscaping works decided by East Riding in the last twelve months, from validation. East Riding decision record →

Public comments

No public comments yet.

Last counted 3 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15241768
Planning Portal ref
PP-15241768
Comments by
16 Oct 2026
Env. assessment
No
East Riding
Planning Authority Score
8.1/10
Excellent
#24 of 296 councils
Relevant to this application:
Householder decisions

East Riding is one of the fastest councils in England for householder decisions, ranking #7 out of 296. Only 14% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
East Riding decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #110 of 296
92%
Householder approved
Above avg (90%) #152 of 296
95%
Decided in 8 weeks
Above avg (63%) #7 of 296
14%
Extended time limit
Below avg (41%) #9 of 296
76%
Minor dwellings approved
190 decided (1-9 homes)
95%
Major dwellings approved
42 decided (10+ homes)
86%
Change of use approved
79 decided
1,887
Total decisions
198 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.