Land South Of 1 Keepers Wood Chichester West Sussex PO19 5XU Data via plota.co.uk

25/01977/TPA - Tree Planning Application Approved

Proposal

Reduce north-west sector by 2m (in line with boundary) on 1 no. Young Lime tree (T1) within Area, A1 subject to . Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
21 Aug 2025
✓
Consultation
29 Aug 2025
✓
Approved
20 Oct 2025

Approved on 20 Oct 2025 · Delegated Decision · Last checked 13 Oct 2026

Site constraints 6

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Also on the record
Radon affected area, class 2; Scheduled monument about 227 m away: Chichester Dyke, earthwork extending N 480yds (440m) from The Drive, Summersdale, near Chichester; Inside the Chichester built-up area; Priority habitat about 44 m away: Deciduous woodland; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Chichester - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Chichester
Application type
Tree Planning Application
Postcode
PO19 5XU
Received
21 Aug 2025
Validated
21 Aug 2025
Ward
Chichester North
Parish
Chichester
Case officer
Show
Target decision
16 Oct 2025
Decision
PERMIT
Decision date
20 Oct 2025
Decision level
Delegated Decision
Applicant
Show
Agent
Treestyler Tree services

How this decision compares

Decided in 60 days from validation, 16 days slower than Chichester's median of 44 for tree and landscaping works. Approved, as 100% of tree and landscaping works here are.

91%decided within 8 weeks
100%approved
301decided in the last year

Plota live figures for tree and landscaping works decided by Chichester in the last twelve months, from validation. Chichester decision record →

Public comments

No public comments yet.

8 neighbours consulted · Last counted 13 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14271504
Planning Portal ref
PP-14271504
Consultation
29 Aug 2025
Comments by
24 Sept 2025
Statutory expiry
16 Oct 2025
Env. assessment
No
Chichester
Planning Authority Score
8.9/10
Excellent
#6 of 296 overall
Relevant to this application:
Householder decisions

Chichester is one of the fastest councils in England for householder decisions: #10 of 296 on speed. Only 18% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Chichester decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #127 of 296
95%
Householder approved
Above avg (90%) #72 of 296
93%
Decided in 8 weeks
Above avg (63%) #10 of 296
18%
Extended time limit
Below avg (41%) #15 of 296
68%
Minor dwellings approved
110 decided (1-9 homes)
76%
Major dwellings approved
17 decided (10+ homes)
74%
Change of use approved
34 decided
935
Total decisions
107 refused in the year to March 2026