Pilgrims Gate Burbage Leicestershire Data via plota.co.uk

26/00970/TPO - Tree Preservation Order Awaiting decision

Proposal

Ash (T8) - Fell Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
2 Nov 2026
Decision
Expected by 28 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 13 Dec 2026 and 24 Dec 2026, from Hinckley and Bosworth's recent tree and landscaping works.

Comments are open until 1 Dec 2026

Comment on this application ↗

Site constraints 4

Burbage conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
6 listed buildings within 150 m
Nearest: Burbage War Memorial, Grade II, 32 m away · 6 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 6 with distances
Historic England ↗
National infrastructure project 884 m away: Hinckley National Rail Freight Interchange
The site is 884 m from the project boundary. Rail freight interchange, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Hinckley built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 4 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hinckley and Bosworth - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Tree Preservation Order
Received
2 Nov 2026
Validated
2 Nov 2026
Ward
Burbage St Catherines & Lash Hill
Parish
Burbage Parish Council
Case officer
Show
Target decision
28 Dec 2026
Decision level
Delegated Decision
Applicant
Show

Decision outlook

Day 21 of the 56-day target. Hinckley and Bosworth usually decides tree and landscaping works by day 42.

Day 2135 days to the 56-day target
84%decided within 8 weeks
90%approved
139decided in the last year

Plota live figures for tree and landscaping works decided by Hinckley and Bosworth in the last twelve months, from validation. Hinckley and Bosworth decision record →

Consultation & key dates

Alt. reference
PP-15336261
Planning Portal ref
PP-15336261
Comments by
1 Dec 2026
Statutory expiry
28 Dec 2026
Env. assessment
No
Hinckley and Bosworth
Planning Authority Score
2.8/10
Poor
#238 of 296 overall
Relevant to this application:
Householder decisions

Hinckley and Bosworth is one of the slowest councils in England for householder decisions: #273 of 296 on speed. The council extends the time limit on 56% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hinckley and Bosworth decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #154 of 296
94%
Householder approved
Above avg (90%) #109 of 296
37%
Decided in 8 weeks
Below avg (63%) #273 of 296
56%
Extended time limit
Above avg (41%) #254 of 296
65%
Minor dwellings approved
46 decided (1-9 homes)
69%
Major dwellings approved
26 decided (10+ homes)
86%
Change of use approved
21 decided
520
Total decisions
63 refused in the year to March 2026