Land South Of Torksey Ferry Road Rampton Nottinghamshire Data via plota.co.uk

26/00300/SCR - Screening Opinion Decided

Proposal

Screening Opinion - Proposed Development of Below Ground Cable Route(s) Connecting a Battery Energy Storage System Consented Under P/A to Cottam Substation to Facilitate the Storage, Importation and Exportation of Energy to the National Grid, together with Access Improvements and Associated Works Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Mar 2026
✓
Consultation
27 Mar 2026
✓
Not EIA Development
24 Apr 2026

Not EIA Development on 24 Apr 2026 · Delegated Decision · Last checked 29 Aug 2026

Associated applications 5

Site constraints 3

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 3. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 76 m away: Tillbridge Solar Project
The site is 76 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Gate Burton Energy Park (decided, 147 m); Cottam Solar Project (decided, 147 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Bassetlaw - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Bassetlaw
Application type
Screening Opinion
Postcode
DN22 0GE
Received
17 Mar 2026
Validated
17 Mar 2026
Ward
Rampton
Parish
Rampton And Woodbeck
Case officer
Show
Target decision
7 Apr 2026
Decision
Not EIA Development
Decision date
24 Apr 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Union 4 Planning

Public comments

No public comments yet.

Last counted 29 Aug 2026

Read the comments on the council site ↗

Consultation & key dates

Consultation
27 Mar 2026
Comments by
10 Apr 2026
Statutory expiry
7 Apr 2026
Env. assessment
No
Bassetlaw
Planning Authority Score
1.2/10
Poor
#286 of 296 councils
Relevant to this application:
Householder decisions

Bassetlaw is one of the slowest councils in England for householder decisions, ranking #291 out of 296. The council extends the time limit on 73% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Bassetlaw decision statistics
Based on MHCLG data, the year to March 2026
85%
Overall approval rate
Below avg (87%) #203 of 296
89%
Householder approved
Below avg (90%) #199 of 296
25%
Decided in 8 weeks
Below avg (63%) #291 of 296
73%
Extended time limit
Above avg (41%) #289 of 296
68%
Minor dwellings approved
77 decided (1-9 homes)
95%
Major dwellings approved
20 decided (10+ homes)
78%
Change of use approved
45 decided
575
Total decisions
87 refused in the year to March 2026