Fern Hill Farm 13 Cemetery Lane Preesall Poulton-Le-Fylde Lancashire FY6 0JA Data via plota.co.uk

26/00029/FUL - Full Application Pending Consideration

Proposal

Retrospective change of use of agricultural land to for car park, milk sales and play area with seating area (sui generis use), including storage container Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
13 Jan 2026
✓
Validated
22 Jan 2026
✓
Consultation
1 Oct 2026
Decision
Expected by 3 Apr 2026

Under consideration

No decision has been issued yet. Plota predicted a decision soon after comments close on 22 Oct 2026; it is now day 260.

Comments are open until 22 Oct 2026

Comment on this application ↗

Site constraints 4

In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 215 m away: Preesall Saltfield Underground Gas Storage
The site is 215 m from the project boundary. Underground gas storage, decided. The project page says whether consent was granted. Also within 2 km: East Irish Sea Transmission Project (at pre-application, 718 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Wyre - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Wyre
Application type
Full Application
Postcode
FY6 0JA
Received
13 Jan 2026
Validated
22 Jan 2026
Ward
Preesall
Parish
Preesall
Case officer
Show
Target decision
3 Apr 2026
Decision level
Delegated
Applicant
Show
Agent
M L Planning

Decision outlook

Day 260, past the statutory target. 81% of agricultural works in Wyre are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 7 Oct 2026.

Day 26014 days to the predicted decision (day 274)
61%decided within 8 weeks
71%approved
9%go to committee

Plota live figures for agricultural works decided by Wyre in the last twelve months, from validation. Wyre decision record →

Public comments

1comment received
1 objecting

3 neighbours consulted · Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14605867
Planning Portal ref
PP-14605867
Neighbours
5 Feb 2026
Consultation
1 Oct 2026
Comments by
22 Oct 2026
Site or press notice
23 Feb 2026
Statutory expiry
19 Mar 2026
Env. assessment
No
Wyre
Planning Authority Score
1.2/10
Poor
#288 of 296 councils
Relevant to this application:
Change of use

Wyre is one of the slowest councils in England for householder decisions, ranking #272 out of 296. The council extends the time limit on 66% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Wyre decision statistics
Based on MHCLG data, the year to March 2026
83%
Overall approval rate
Below avg (87%) #243 of 296
88%
Householder approved
Below avg (90%) #228 of 296
38%
Decided in 8 weeks
Below avg (63%) #272 of 296
66%
Extended time limit
Above avg (41%) #281 of 296
56%
Minor dwellings approved
41 decided (1-9 homes)
67%
Major dwellings approved
6 decided (10+ homes)
75%
Change of use approved
52 decided
539
Total decisions
90 refused in the year to March 2026