Land To Rear/side Of 3 Stanton Drive Chichester West Sussex PO19 5QN Data via plota.co.uk

25/00199/TPA - Tree Planning Application Approved

Proposal

Reduce north sector (next to garage) by up to 3m on 1 no. Sycamore tree (T1) and reduce north sector by up to 1m on 1 no Conifer tree (T4). Reduce west sector (overhanging garden) by up to 3m on 2 no. Sycamore trees (T2 and T3). All 4 no. trees within Woodland, W1 subject to . Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
28 Jan 2025
✓
Validated
19 Mar 2025
✓
Consultation
31 Mar 2025
✓
Approved
2 May 2025

Approved on 2 May 2025 · Delegated Decision · Last checked 18 Oct 2026

Site constraints 4

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Also on the record
Radon affected area, class 2; Scheduled monument about 224 m away: Chichester Dyke, earthwork extending N 480yds (440m) from The Drive, Summersdale, near Chichester; Inside the Chichester built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 1 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Chichester - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Chichester
Application type
Tree Planning Application
Postcode
PO19 5QN
Received
28 Jan 2025
Validated
19 Mar 2025
Ward
Chichester North
Parish
Chichester
Case officer
Show
Target decision
14 May 2025
Decision
PERMIT
Decision date
2 May 2025
Decision level
Delegated Decision
Applicant
Show
Agent
Climbers Way Tree Care Ltd

How this decision compares

Decided in 44 days from validation, about the council's usual 44 days. Approved, as 100% of tree and landscaping works here are.

91%decided within 8 weeks
100%approved
301decided in the last year

Plota live figures for tree and landscaping works decided by Chichester in the last twelve months, from validation. Chichester decision record →

Public comments

No public comments yet.

9 neighbours consulted · Last counted 18 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-13729976
Planning Portal ref
PP-13729976
Consultation
31 Mar 2025
Comments by
22 Apr 2025
Statutory expiry
14 May 2025
Env. assessment
No
Chichester
Planning Authority Score
8.9/10
Excellent
#6 of 296 overall
Relevant to this application:
Householder decisions

Chichester is one of the fastest councils in England for householder decisions: #10 of 296 on speed. Only 18% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Chichester decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #127 of 296
95%
Householder approved
Above avg (90%) #72 of 296
93%
Decided in 8 weeks
Above avg (63%) #10 of 296
18%
Extended time limit
Below avg (41%) #15 of 296
68%
Minor dwellings approved
110 decided (1-9 homes)
76%
Major dwellings approved
17 decided (10+ homes)
74%
Change of use approved
34 decided
935
Total decisions
107 refused in the year to March 2026