Flat 2 11 - 13 Sinclair Gardens London W14 0AU Data via plota.co.uk

2025/01887/TREE - Works to Tree(s) in Conservation Area REGISTERED: Pending recommendation

Proposal

T1. European Lime - Rear Garden - Reduce new growth to previous reduction points or reduce height and lateral spread by 2.5m - Thin branch structure as necessary to help create an even balance - Remove dead crown branches over 2.5cm dia. Current height 17m, crown spread 9m; Proposed height 14.5m, crown spread 6.5m. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
9 Jul 2025
Decision
Target date was 3 Sept 2025

Under consideration

No decision has been issued yet. Plota predicted a decision around 6 Nov 2026; it is now day 485.

Site constraints 7

Lakeside/Sinclair/Blythe Road conservation area
Also 3B. Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Air quality management area: Hammersmith and Fulham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
National infrastructure project 1101 m away: Thames Tideway Tunnel; Inside the Hammersmith and Fulham built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square; Town centre 14 m away: Shepherds Bush Town Centre.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hammersmith and Fulham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Works to Tree(s) in Conservation Area
Postcode
W14 0AU
Received
9 Jul 2025
Validated
9 Jul 2025
Ward
Addison
Case officer
Show
Applicant
Show

Decision outlook

Day 485, past the statutory target. 94% of tree and landscaping works in Hammersmith and Fulham are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 2 Nov 2026.

Day 485429 days past the 56-day target
75%decided within 8 weeks
96%approved
75decided in the last year

Plota live figures for tree and landscaping works decided by Hammersmith and Fulham in the last twelve months, from validation. Hammersmith and Fulham decision record →

Consultation & key dates

Consultation
20 Aug 2025
Hammersmith and Fulham
Planning Authority Score
3.7/10
Below average
#210 of 296 councils
Relevant to this application:
Other decisions

Hammersmith and Fulham is one of the slowest councils in England for householder decisions, ranking #281 out of 296. The council extends the time limit on 63% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hammersmith and Fulham decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #20 of 296
99%
Householder approved
Above avg (90%) #4 of 296
33%
Decided in 8 weeks
Below avg (63%) #281 of 296
63%
Extended time limit
Above avg (41%) #275 of 296
97%
Minor dwellings approved
209 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
92%
Change of use approved
37 decided
1,321
Total decisions
60 refused in the year to March 2026