Fircroft 1 London Road Uppingham Rutland LE15 9TL Data via plota.co.uk

2025/1007/FUL - Full Application Approved

Proposal

Retrospective application for the erection of three polytunnels and a potting shed alongside additional hard standing at Fircroft, 1 London Road, Uppingham plus BNG site. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
15 Aug 2025
✓
Validated
22 Aug 2025
✓
Consultation
27 Aug 2025
✓
Approved
8 Oct 2025

Approved on 8 Oct 2025 · Delegated Decision · Last checked 16 Oct 2026

Site constraints 4

Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
Inside the Uppingham built-up area; Priority habitat 26 m away: Deciduous woodland; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area293 m² (3,154 sq ft)
Energy ratingE (48 out of 100), could reach C
PropertyEnd-terrace house, 9 habitable rooms
BuiltBefore 1900
HeatingCommunity scheme
WallsSandstone or limestone, as built, no insulation (assumed)

From the energy performance certificate lodged in April 2024, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Rutland - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Rutland
Application type
Full Application
Postcode
LE15 9TL
Received
15 Aug 2025
Validated
22 Aug 2025
Ward
Uppingham Ward
Parish
Uppingham Town Council
Case officer
Show
Target decision
17 Oct 2025
Decision
Approve
Decision date
8 Oct 2025
Decision level
Delegated Decision
Applicant
Show
Agent
Fisher German LLP

How this decision compares

Decided in 47 days from validation, 9 days faster than Rutland's median of 56 for full applications. Approved, as 88% of full applications here are.

62%decided within 8 weeks
88%approved
333decided in the last year

Plota live figures for full applications decided by Rutland in the last twelve months, from validation. Rutland decision record →

Public comments

No public comments yet.

1 neighbour consulted · Last counted 16 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14257819
Planning Portal ref
PP-14257819
Consultation
27 Aug 2025
Comments by
18 Sept 2025
Site or press notice
28 Aug 2025
Statutory expiry
17 Oct 2025
Env. assessment
No
Rutland
Planning Authority Score
6.2/10
Average
#93 of 296 overall
Relevant to this application:
Householder decisions

Rutland is faster than most councils at deciding householder applications: #87 of 296 on speed. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Rutland decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #142 of 296
92%
Householder approved
Above avg (90%) #164 of 296
74%
Decided in 8 weeks
Above avg (63%) #87 of 296
34%
Extended time limit
Below avg (41%) #91 of 296
65%
Minor dwellings approved
43 decided (1-9 homes)
87%
Major dwellings approved
15 decided (10+ homes)
83%
Change of use approved
24 decided
520
Total decisions
57 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.