The White House Scorrier Redruth Cornwall TR16 5AT Data via plota.co.uk

PA26/06277 - Tree Preservation Order Awaiting decision

Proposal

Works to trees subject to a Tree Preservation Order (TPO), works include Sycamore, Fell to ground level. Reason. Basal decay due to Polyporus Squamosus. Replace with Sessile Oak. 1 metre whip. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
9 Sept 2026
Decision
Expected by 4 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 16 Oct 2026, from Cornwall's recent tree and landscaping works.

Site constraints 7

Grade II listed: The White House
List entry 1328197 · 0 m away · 1 more listed building within 150 m (1 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other one with distances
Historic England ↗
World heritage site: Cornwall and West Devon Mining Landscape
Nationally designated heritage. Its significance and setting carry great weight.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Radon affected area, class 6
An estimated 30% or more of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
Inside the Scorrier and Wheal Rose built-up area; Priority habitat 21 m away: Deciduous woodland; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Cornwall - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Cornwall
Application type
Tree Preservation Order
Postcode
TR16 5AT
Received
9 Sept 2026
Validated
9 Sept 2026
Ward
Redruth Central, Carharrack And St Day
Parish
St. Day
Case officer
Show
Target decision
4 Nov 2026
Applicant
Show

Decision outlook

Day 30 of the 56-day target. Cornwall usually decides tree and landscaping works by day 37.

Day 3026 days to the 56-day target
95%decided within 8 weeks
88%approved
841decided in the last year

Plota live figures for tree and landscaping works decided by Cornwall in the last twelve months, from validation. Cornwall decision record →

Public comments

No public comments yet.

Last counted 2 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15214388
Planning Portal ref
PP-15214388
Statutory expiry
4 Nov 2026
Env. assessment
No
Cornwall
Planning Authority Score
7.9/10
Good
#28 of 296 councils
Relevant to this application:
Householder decisions

Cornwall is faster than most councils at deciding householder applications, ranking #64 out of 296. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Cornwall decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #79 of 296
97%
Householder approved
Above avg (90%) #28 of 296
76%
Decided in 8 weeks
Above avg (63%) #64 of 296
35%
Extended time limit
Below avg (41%) #101 of 296
82%
Minor dwellings approved
1180 decided (1-9 homes)
94%
Major dwellings approved
67 decided (10+ homes)
93%
Change of use approved
194 decided
4,839
Total decisions
363 refused in the year to March 2026