St Thomas' Hospital 249 Westminster Bridge Road London Lambeth SE1 7EH Data via plota.co.uk

26/02783/TCA - Approval for works to trees in CA Awaiting decision

Proposal

T1 - T10 London Plane - remove deadwood and Marissa diseased branches T11 - Weeping Ash - remove deadwood and Marissa diseased branches T12-19 Oriental Plane remove deadwood and Marissa diseased branches Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
25 Sept 2026
Decision
Expected by 6 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 24 Oct 2026, from Lambeth's recent tree and landscaping works.

Site constraints 12

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Albert Embankment conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
National infrastructure project: Thames Tideway Tunnel
The site is inside the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 432 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Lambeth AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
12 listed buildings within 150 m
Nearest: Stone Statue of Edward Vi at North Entrance to Ward Block of North Wing at St Thomas' Hospital, Grade II*, 44 m away · 1 Grade I, 3 Grade II*, 4 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 12 with distances
Historic England ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Registered park or garden 179 m away: Lambeth Palace; Inside the Lambeth built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square.
Not affected
Not green belt · No scheduled monument at the site

Checked on 7 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area2,764 m² (29,751 sq ft)
Energy ratingC (asset rating 65)
UseNon-residential Institutions: Primary Health Care Building
HeatingAir Conditioning

From the energy performance certificate lodged in December 2023, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Lambeth - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Lambeth
Application type
Approval for works to trees in CA
Postcode
SE1 7EH
Received
25 Sept 2026
Validated
25 Sept 2026
Ward
Waterloo & South Bank
Case officer
Show
Target decision
6 Nov 2026
Applicant
Show

Decision outlook

Day 14 of the 56-day target. Lambeth usually decides tree and landscaping works by day 29.

Day 1442 days to the 56-day target
93%decided within 8 weeks
93%approved
334decided in the last year

Plota live figures for tree and landscaping works decided by Lambeth in the last twelve months, from validation. Lambeth decision record →

Public comments

No public comments yet.

Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
6 Nov 2026
Env. assessment
No
Lambeth
Planning Authority Score
2.7/10
Poor
#242 of 296 councils
Relevant to this application:
Householder decisions

Lambeth ranks #164 out of 296 councils for householder decision speed. 47% of applications have the time limit extended, above the 41% national average. Lambeth is also one of the strictest councils - it refuses more householder applications than almost any other, with only 81% approved vs 90% nationally.

One of the strictest councils
only 81% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Lambeth decision statistics
Based on MHCLG data, the year to March 2026
78%
Overall approval rate
Below avg (87%) #274 of 296
81%
Householder approved
Below avg (90%) #273 of 296
62%
Decided in 8 weeks
Below avg (63%) #164 of 296
47%
Extended time limit
Above avg (41%) #209 of 296
46%
Minor dwellings approved
70 decided (1-9 homes)
100%
Major dwellings approved
9 decided (10+ homes)
42%
Change of use approved
53 decided
1,784
Total decisions
396 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.