241 - 243 Milton Road Portsmouth PO4 8PH Data via plota.co.uk

26/00493/FUL - Full Application Refused

Proposal

Construction of 5 storey building to form a 21 bed Co-Living development (Sui Generis) with associated communal internal; external amenity and laundry; accessible dry recycling and refuse storage; servicing and delivery zone; landscaping; safe and accessible cycle storage; boundary treatments and other associated works (following demolition of existing single storey building) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Apr 2026
✓
Validated
20 Apr 2026
✓
Consultation
30 Jun 2026
✗
Refused
23 Oct 2026
Appeal
Not lodged

Refused on 23 Oct 2026 · Committee Decision · Last checked 27 Oct 2026

Planning committee

Decided by Portsmouth Planning Committee on 21 Oct 2026.

Refused

As officers recommended.

  • Officers advised refusal because the scheme was not genuine co-living and harmed future occupiers, neighbours and the Solent protection area.
  • Residents raised concerns about parking, traffic, height, privacy, safety, living conditions, noise, infrastructure and environmental effects.
  • The committee refused permission for the officer’s stated reasons after considering the scheme’s communal facilities, terrace, overlooking and other impacts.
Read how the committee decided The proposed development, site history, officer assessment, objections, speakers, committee debate and refusal reasons.

Source: Plota analysis of Portsmouth's committee minutes of 21 Oct 2026.

Documents 29

All documents on the council site ↗

Site constraints 6

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Air quality management area: Portsmouth AQMA No.9
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 643 m away: AQUIND Interconnector
The site is 643 m from the project boundary. Electricity line, awaiting the Secretary of State's decision. Also within 2 km: Hampshire Water Transfer and Water Recycling Project (accepted for examination, 1120 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Radon affected area, class 3; Inside the Portsmouth built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £181,436 in August 1996. Semi-detached house, freehold.

20 August 1996£181,436

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area257 m² (2,766 sq ft)
Energy ratingF (asset rating 133)
UseA1/A2 Retail and Financial/Professional services
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in September 2013, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Portsmouth - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Portsmouth
Application type
Full Application
Postcode
PO4 8PH
Received
17 Apr 2026
Validated
20 Apr 2026
Ward
Milton
Case officer
Show
Target decision
30 Oct 2026
Decision
Refuse
Decision date
23 Oct 2026
Decision level
Committee Decision
Applicant
Show
Agent
The Midas Plan Consultants

How this decision compares

Decided in 186 days from validation, 118 days slower than Portsmouth's median of 68 for commercial and major works. Refused, as 20% of commercial and major works here are.

36%decided within 8 weeks
80%approved
12%go to committee

Plota live figures for commercial and major works decided by Portsmouth in the last twelve months, from validation. Portsmouth decision record →

Public comments

98comments received
95 objecting2 neutral1 supporting

97% object · above the UK average of 74%

12 neighbours consulted · Last counted 27 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14804236
Planning Portal ref
PP-14804236
Neighbours
7 May 2026
Consultation
30 Jun 2026
Comments by
21 Jul 2026
Site or press notice
15 May 2026
Committee
21 Oct 2026
Statutory expiry
20 Jul 2026
Env. assessment
No
Portsmouth
Planning Authority Score
3.1/10
Poor
#232 of 296 councils
Relevant to this application:
Householder decisions

Portsmouth ranks #188 out of 296 councils for householder decision speed. 48% of applications have the time limit extended, above the 41% national average. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Portsmouth decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #196 of 296
89%
Householder approved
Below avg (90%) #207 of 296
60%
Decided in 8 weeks
Below avg (63%) #188 of 296
48%
Extended time limit
Above avg (41%) #217 of 296
61%
Minor dwellings approved
44 decided (1-9 homes)
90%
Major dwellings approved
10 decided (10+ homes)
77%
Change of use approved
99 decided
613
Total decisions
85 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.