Site 1 The Boathouse Moorings Chesterton Road Cambridge Cambridgeshire Data via plota.co.uk

26/0583/TTCA - Works to CA trees Approved

Proposal

T.1 Oak - crown reduction of approximately 2m, equating to no more than 30% of the leaf-bearing crown volume. Remove all ivy from the main stem and primary scaffold branches. Crown lift to 2.4m above ground level by removing selected lower secondary branches as appropriate. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
10 Jun 2026
✓
Approved
15 Jul 2026

Approved on 15 Jul 2026 · Tree - Officer (SCDC) · Last checked 20 Jul 2026

Site constraints 10

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Public footpath 1 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Historic Core conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Open access land
Open country or registered common land, with a right to roam on foot.
Building on registered common land needs the consent of the Secretary of State as well as planning permission.
Air quality management area: Cambridge AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
Nature recovery project: Cambridge Core Area; Flood defence 1 m away (natural high ground, designed for a 1 in 10 year flood); 1 listed building within 150 m; Inside the Cambridge (Cambridge) built-up area; National infrastructure project 1.6 km away: East West Rail - Bedford to Cambridge and Western improvements, at pre-application.
Not affected
Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Cambridge - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Cambridge
Application type
Works to CA trees
Postcode
CB4 3AX
Received
10 Jun 2026
Validated
10 Jun 2026
Ward
West Chesterton
Case officer
Show
Target decision
22 Jul 2026
Decision
Have No Objection To
Decision date
15 Jul 2026
Decision level
Tree - Officer (SCDC)
Applicant
Show
Agent
SHIRE TREES LIMITED

How this decision compares

Decided in 35 days from validation, about the council's usual 36 days. Approved, as 96% of tree and landscaping works here are.

94%decided within 8 weeks
96%approved
662decided in the last year

Plota live figures for tree and landscaping works decided by Cambridge in the last twelve months, from validation. Cambridge decision record →

Consultation & key dates

Statutory expiry
22 Jul 2026
Env. assessment
No
Cambridge
Planning Authority Score
8.3/10
Excellent
#18 of 296 overall
Relevant to this application:
Householder decisions

Cambridge is one of the fastest councils in England for householder decisions: #21 of 296 on speed. Only 26% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Cambridge decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #108 of 296
94%
Householder approved
Above avg (90%) #100 of 296
86%
Decided in 8 weeks
Above avg (63%) #21 of 296
26%
Extended time limit
Below avg (41%) #34 of 296
74%
Minor dwellings approved
86 decided (1-9 homes)
80%
Major dwellings approved
5 decided (10+ homes)
80%
Change of use approved
41 decided
1,014
Total decisions
100 refused in the year to March 2026