Car Park Etnam Street Leominster Herefordshire HR6 8AE Data via plota.co.uk

P253328/K - Works to Trees in a Conservation Area Approved

Proposal

5 DAY NOTICE - Standing dead pine on the bank of carpark, the tree needs dismantling. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
18 Nov 2025
✓
Validated
21 Nov 2025
✓
Approved
25 Nov 2025

Approved on 25 Nov 2025 · Last checked 14 Oct 2026

Site constraints 9

Nutrient neutrality catchment: River Wye SAC (River Lugg SSSI)
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Public footpath 4 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Leominster Town conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
38 listed buildings within 150 m
Nearest: The Nook, Grade II, 53 m away · 1 Grade II*, 37 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 38 with distances
Historic England ↗
Also on the record
Scheduled monument 167 m away: Forbury Chapel; Radon affected area, class 2; SSSI 355 m away: River Lugg SSSI; Inside the Leominster built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Herefordshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Works to Trees in a Conservation Area
Postcode
HR6 8AE
Received
18 Nov 2025
Validated
21 Nov 2025
Ward
Leominster East
Parish
Leominster
Target decision
16 Jan 2026
Decision
Trees in Cons Area Works Can Proceed
Decision date
25 Nov 2025

How this decision compares

Decided in 4 days from validation, 33 days faster than Herefordshire's median of 37 for tree and landscaping works. Approved, as 95% of tree and landscaping works here are.

96%decided within 8 weeks
95%approved
502decided in the last year

Plota live figures for tree and landscaping works decided by Herefordshire in the last twelve months, from validation. Herefordshire decision record →

Consultation & key dates

Consultation
24 Nov 2025
Site or press notice
24 Nov 2025
Herefordshire
Planning Authority Score
3.3/10
Poor
#224 of 296 overall
Relevant to this application:
Other decisions

Herefordshire is slower than most councils at deciding householder applications: #250 of 296 on speed. The council extends the time limit on 60% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Herefordshire decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #56 of 296
95%
Householder approved
Above avg (90%) #79 of 296
46%
Decided in 8 weeks
Below avg (63%) #250 of 296
60%
Extended time limit
Above avg (41%) #269 of 296
89%
Minor dwellings approved
278 decided (1-9 homes)
67%
Major dwellings approved
18 decided (10+ homes)
92%
Change of use approved
104 decided
1,406
Total decisions
96 refused in the year to March 2026