Land 200 Metres North West Of Jamesfield Garden Centre Newburgh KY14 6EW Data via plota.co.uk

26/00067/FLM - planning permission major Refused

Proposal

Installation of 49.9MW battery energy storage system (BESS), formation of SUDS, associated infrastructure and landscaping works Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
20 Jan 2026
✓
Validated
6 Feb 2026
✓
Committee
8 Jul 2026
✗
Refused
8 Jul 2026
Appeal
Not lodged

Refused on 8 Jul 2026 · Committee Decision · Last checked 10 Jul 2026

Planning committee

Decided by Perth Planning and Placemaking Committee on 8 Jul 2026.

Refused

Against officer advice: officers had recommended approval.

  • Officers advised approval because the proposal complied with the Development Plan and no material considerations outweighed it.
  • One representation raised concerns about construction traffic, fire safety, landscape, noise, prime agricultural land and community benefits.
  • The committee voted six to four to refuse because of prime agricultural land loss and cumulative industrialisation.
Read how the committee decided The proposal, site history, officers’ assessment, objections, committee debate, vote and reasons for refusal. Includes the meeting recording

Source: Plota analysis of Perth's committee minutes of 8 Jul 2026.

Documents 94

Plans & drawings 27

PDF PROPOSED PLANTING PLAN Drawing · 8 Jun 2026 View ↗ PDF EARTHWORKS PLAN Drawing · 8 Jun 2026 View ↗ PDF REVISED PLANTING PLAN Drawing · 21 May 2026 View ↗ PDF PLANTING PLAN Drawing · 30 Apr 2026 View ↗ PDF 68 RE GRID CONNECTION Drawing · 17 Apr 2026 View ↗ PDF 67 REVISED PLANTING PLAN Drawing · 1 Apr 2026 View ↗ PDF DEVELOPMENT PLAN TEAM RESPONSE Internal Consultees · 17 Mar 2026 View ↗ PDF REVISED PLANTING PLAN Drawing · 6 Mar 2026 View ↗ PDF REVISED SITE CONSTRAINTS PLAN Drawing · 6 Mar 2026 View ↗ PDF 10 CANADIAN SOLAR PCS PLAN AND ELEVATIONS Drawing · 3 Feb 2026 View ↗ PDF 07 CANADIAN SOLAR BESS PLAN AND ELEVATIONS Drawing · 3 Feb 2026 View ↗ PDF 16 POC TRANSFORMER PLAN AND ELEVATIONS Drawing · 3 Feb 2026 View ↗ PDF 14 AUXILIARY TRANSFORMER PLAN AND ELEVATIONS Drawing · 29 Jan 2026 View ↗ PDF 05 CONTROL ROOM PLAN AND ELEVATIONS Drawing · 29 Jan 2026 View ↗ PDF 15 SWITCHROOM PLAN AND ELEVATIONS Drawing · 29 Jan 2026 View ↗ PDF 06 PLANTING PLAN Drawing · 28 Jan 2026 View ↗ PDF 04 PROPOSED SITE PLAN Drawing · 28 Jan 2026 View ↗ PDF 08 CCTV AND LIGHTING PLAN AND ELEVATIONS Drawing · 20 Jan 2026 View ↗ PDF 09 CONSTRAINTS PLAN Drawing · 20 Jan 2026 View ↗ PDF 36 CONSTRUCTION TRAFFIC MANAGEMENT PLAN Report · 20 Jan 2026 View ↗ PDF 13 CONTAINER PLAN AND ELEVATIONS Drawing · 20 Jan 2026 View ↗ PDF 11 EARTHWORKS OVERVIEW Drawing · 20 Jan 2026 View ↗ PDF 02 EXISTING SITE PLAN Drawing · 20 Jan 2026 View ↗ PDF 12 FENCE DETAILS Drawing · 20 Jan 2026 View ↗ PDF 42 FIRE WATER MANAGEMENT PLAN Report · 20 Jan 2026 View ↗ PDF 01 LOCATION PLAN Drawing · 20 Jan 2026 View ↗ PDF 03 PROPOSED SITE PLAN Drawing · 20 Jan 2026 View ↗

Other documents 30

PDF SCREENING OPINION Report · 28 May 2026 View ↗ PDF PLANTING MAINTENANCE Report · 30 Apr 2026 View ↗ PDF GRID CONNECTION DETAILS Report · 28 Apr 2026 View ↗ PDF PEAR V2 Report · 7 Apr 2026 View ↗ PDF 64 FIGURE 1_15A-B - VP08 CASTLE LAW FORT - V1_2 Other · 23 Feb 2026 View ↗ PDF 63 FIGURE 5_10D - VP03 A913 - WITH PLANTING - V1_0 Other · 23 Feb 2026 View ↗ PDF 62 FIGURE 5_7 - CUMULATIVE BASEMAP - V1_2 Other · 23 Feb 2026 View ↗ PDF 61 FIGURE 5_8D - VP01 JAMESFIELD GARDEN CENTRE - WITH PLANTING - V1_0 Other · 23 Feb 2026 View ↗ PDF 28 APPENDIX 1.1 - LVIA METHODOLOGY Report · 20 Jan 2026 View ↗ PDF 29 FIGURE 1.1 - 5KM STUDY AREA Report · 20 Jan 2026 View ↗ PDF 47 FIGURE 1.10 - VP03 A913 Report · 20 Jan 2026 View ↗ PDF 30 FIGURE 1.11 - VP04 BALGONIE FARM Report · 20 Jan 2026 View ↗ PDF 17 FIGURE 1.12 - VP05 BALGONIE ROAD Report · 20 Jan 2026 View ↗ PDF 31 FIGURE 1.13 - VP06 CORE PATH 40/1 Report · 20 Jan 2026 View ↗ PDF 37 FIGURE 1.14 - VP07 GATTAWAY Report · 20 Jan 2026 View ↗ PDF 48 FIGURE 1.15A-B - VP08 CASTLE LAW FORT Report · 20 Jan 2026 View ↗ PDF 32 FIGURE 1.16 - VP09 WOODRIFFE ROAD Report · 20 Jan 2026 View ↗ PDF 18 FIGURE 1.17 - VP10 FINGASK FARM Report · 20 Jan 2026 View ↗ PDF 38 FIGURE 1.2 - LANDSCAPE CHARACTER TYPES Report · 20 Jan 2026 View ↗ PDF 19 FIGURE 1.3 - LANDSCAPE CHARACTER AREAS Report · 20 Jan 2026 View ↗ PDF 20 FIGURE 1.4 - LANDSCAPE PLANNING DESIGNATIONS Report · 20 Jan 2026 View ↗ PDF 39 FIGURE 1.5 - BESS ZTV Report · 20 Jan 2026 View ↗ PDF 40 FIGURE 1.6 - RESIDENTIAL AMENITY BASEMAP Report · 20 Jan 2026 View ↗ PDF 41 FIGURE 1.7 - CUMULATIVE BASEMAP Report · 20 Jan 2026 View ↗ PDF 21 FIGURE 1.8 - VP01 JAMESFIELD GARDEN CENTRE Report · 20 Jan 2026 View ↗ PDF 22 FIGURE 1.9 - VP02 JAMESFIELD ROAD Report · 20 Jan 2026 View ↗ PDF 44 GEOLOGY AND GROUND CONDITIONS ENVIRONMENTAL APPRAISAL Report · 20 Jan 2026 View ↗ PDF 49 GEOLOGY AND GROUND CONDITIONS ENVIRONMENTAL APPRAISAL Report · 20 Jan 2026 View ↗ PDF 45 LAND CAPABILITY FOR AGRICULTURE Report · 20 Jan 2026 View ↗ PDF 34 PRELIMINARY GEOENVIRONMENTAL APPRAISAL Report · 20 Jan 2026 View ↗

All documents on the council site ↗

Site constraints 2

Also on the record
Special protection area about 409 m away: Firth of Tay and Eden Estuary; SSSI about 409 m away: Inner Tay Estuary.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 11 September 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Perth - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Perth
Application type
planning permission major
Postcode
KY14 6EW
Received
20 Jan 2026
Validated
6 Feb 2026
Ward
Almond And Earn
Parish
Abernethy
Case officer
Show
Decision
refuse the application
Decision date
8 Jul 2026
Decision level
Committee Decision
Applicant
Show
Agent
Scott Hobbs Planning

How this decision compares

Decided in 152 days from validation, 100 days slower than Perth's median of 52 for utility and infrastructure works. Refused, as 8% of utility and infrastructure works here are.

61%decided within 8 weeks
92%approved
9%go to committee

Plota live figures for utility and infrastructure works decided by Perth in the last twelve months, from validation. Perth decision record →

Consultation & key dates

Env. assessment
No