Land South Of Bwlch Y Ffridd Bwlch-y-Ffridd Newtown Powys SY16 3JN Data via plota.co.uk

25/1690/FUL - Full planning permission Approved

Proposal

Proposed tourism of 4 holiday cabins, new access, package treatment plant and all associated works Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
24 Nov 2025
✓
Validated
15 Jan 2026
✓
Approved
25 Sept 2026

Approved on 25 Sept 2026 · Planning Committee · Last checked 28 Sept 2026

Planning committee

Decided by Powys Planning, Taxi Licensing & Rights of Way Committee on 3 Sept 2026.

Approved

As officers recommended.

  • Officers advised approval because the development complied with relevant tourism, design, landscape, highway, drainage and ecological considerations, subject to conditions.
  • Residents raised concerns about publicity, lighting, amenity, noise, ecology, highways, management, land ownership and possible future impacts.
  • The committee approved the application and added a signage scheme condition after discussing passing bays, flooding, ecology and highway safety.
Read how the committee decided The proposed cabins, site history, officer assessment, objections, committee debate, vote and decision.

Source: Plota analysis of Powys's committee minutes of 3 Sept 2026.

Documents 23

All documents on the council site ↗

Site constraints 2

Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Also on the record
Radon affected area, class 2.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 3 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Powys - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Powys
Application type
Full planning permission
Postcode
SY16 3JN
Received
24 Nov 2025
Validated
15 Jan 2026
Ward
Rhiwcynon
Parish
Aberhafesp
Case officer
Show
Target decision
12 Mar 2026
Decision
Approve with Conditions
Decision date
25 Sept 2026
Decision level
Planning Committee
Applicant
Show
Agent
Ted Maury

How this decision compares

Decided in 253 days from validation, 156 days slower than Powys's median of 97 for commercial and major works. Approved, as 84% of commercial and major works here are.

36%decided within 8 weeks
84%approved
5%go to committee

Plota live figures for commercial and major works decided by Powys in the last twelve months, from validation. Powys decision record →

Public comments

1comment received
1 neutral

Last counted 28 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Committee
3 Sept 2026