48 Hurricane Way Norwich NR6 6JB Data via plota.co.uk

26/01122/F - Full Awaiting decision

Proposal

Installation of external condenser unit for new air conditioning system for existing offices. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
27 Oct 2026
✓
Consultation
10 Nov 2026
Decision
Expected by 22 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 20 Dec 2026, from Norwich's recent utility and infrastructure works.

Comments are open until 1 Dec 2026

Comment on this application ↗

Site constraints 3

Nutrient neutrality catchment: Yare Broads and Marshes
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
National infrastructure project 800 m away: Norwich Northern Distributor Road (NDR)
The site is 800 m from the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Norwich built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 11 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area1,414 m² (15,220 sq ft)
Energy ratingC (asset rating 74)
UseStorage or Distribution
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in August 2022, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in Norwich - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Norwich
Application type
Full
Postcode
NR6 6JB
Received
27 Oct 2026
Validated
27 Oct 2026
Ward
Catton Grove
Case officer
Show
Applicant
Show
Agent
Alan Irvine
Leaseholder
Show

Decision outlook

Day 27 of the 56-day target. Norwich usually decides utility and infrastructure works by day 54.

Day 2729 days to the 56-day target
76%decided within 8 weeks
100%approved
27decided in the last year

Plota live figures for utility and infrastructure works decided by Norwich in the last twelve months, from validation. Norwich decision record →

Public comments

No public comments yet.

1 neighbour consulted · Last counted 17 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Neighbours
10 Nov 2026
Consultation
10 Nov 2026
Comments by
1 Dec 2026
Env. assessment
No
Norwich
Planning Authority Score
8.6/10
Excellent
#15 of 296 overall
Relevant to this application:
Householder decisions

Norwich is faster than most councils at deciding householder applications: #68 of 296 on speed. Only 22% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Norwich decision statistics
Based on MHCLG data, the year to March 2026
96%
Overall approval rate
Above avg (87%) #14 of 296
97%
Householder approved
Above avg (90%) #39 of 296
76%
Decided in 8 weeks
Above avg (63%) #68 of 296
22%
Extended time limit
Below avg (41%) #24 of 296
94%
Minor dwellings approved
34 decided (1-9 homes)
100%
Major dwellings approved
2 decided (10+ homes)
89%
Change of use approved
38 decided
538
Total decisions
23 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.