26/0412/HOUS - Householder Application Approved

Proposal

Proposed single storey side extension and canopy to front elevation Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
31 Mar 2026
✓
Consultation
15 May 2026
✓
Approved
15 May 2026

Approved on 15 May 2026 · Delegated Decision · Last checked 26 Jul 2026

Site constraints 6

Public footpath 13 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 154 m away: Fosse Green Energy
The site is 154 m from the project boundary. Generating station, examination closed, recommendation due.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Radon affected area, class 6
An estimated 30% or more of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
Conservation area 32 m away: Boothby Graffoe; 2 listed buildings within 150 m.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in North Kesteven - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Householder Application
Postcode
LN5 0LQ
Received
31 Mar 2026
Validated
31 Mar 2026
Parish
Boothby Graffoe
Case officer
Show
Target decision
26 May 2026
Decision
Approved
Decision date
15 May 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Lincolnshire Architectural Design Ltd.

How this decision compares

Decided in 45 days from validation, 10 days faster than North Kesteven's median of 55 for extensions. Approved, as 99% of extensions here are.

76%decided within 8 weeks
99%approved
263decided in the last year

Plota live figures for extensions decided by North Kesteven in the last twelve months, from validation. North Kesteven decision record →

Consultation & key dates

Alt. reference
PP-14824312
Planning Portal ref
PP-14824312
Neighbours
2 Apr 2026
Consultation
15 May 2026
Comments by
15 May 2026
Site or press notice
10 Apr 2026
Statutory expiry
26 May 2026
Env. assessment
No
North Kesteven
Planning Authority Score
6.5/10
Good
#79 of 296 councils
Relevant to this application:
Householder decisions

North Kesteven ranks #117 out of 296 councils for householder decision speed. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

More permissive than most councils
99% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
North Kesteven decision statistics
Based on MHCLG data, the year to March 2026
97%
Overall approval rate
Above avg (87%) #4 of 296
99%
Householder approved
Above avg (90%) #6 of 296
71%
Decided in 8 weeks
Above avg (63%) #117 of 296
45%
Extended time limit
Above avg (41%) #193 of 296
90%
Minor dwellings approved
67 decided (1-9 homes)
100%
Major dwellings approved
9 decided (10+ homes)
97%
Change of use approved
36 decided
631
Total decisions
19 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use