115A Midland Road Bedford Bedfordshire MK40 1DA Data via plota.co.uk

26/01719/FUL - Full Planning Awaiting decision

Proposal

Installation of an external kitchen extraction system and flue, together with two condenser units within an acoustic enclosure to the rear, and alterations to the existing shopfront, including a replacement entrance door and associated glazing. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
8 Sept 2026
✓
Consultation
14 Sept 2026
Decision
Target date was 20 Nov 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 23 Nov 2026; it is now day 76.

The consultation period closed on 12 Oct 2026.

Site constraints 3

Air quality management area: Bedford Town Centre AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
National infrastructure project 175 m away: East West Rail - Bedford to Cambridge and Western improvements, at pre-application; Inside the Bedford built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area80 m² (861 sq ft)
Energy ratingB (asset rating 42)
UseRetail/Financial and Professional Services
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in February 2025, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Bedford - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Bedford
Application type
Full Planning
Postcode
MK40 1DA
Received
8 Sept 2026
Validated
8 Sept 2026
Ward
Greyfriars
Parish
Bedford Town
Case officer
Show
Target decision
20 Nov 2026
Applicant
Show
Agent
Architecture365 LTD - Mr M Imtiaz

Decision outlook

Day 76, past the statutory target. 93% of utility and infrastructure works in Bedford are decided within thirteen weeks, which runs to 8 Dec 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 22 Nov 2026.

Day 7620 days past the 56-day target
50%decided within 8 weeks
88%approved
64decided in the last year

Plota live figures for utility and infrastructure works decided by Bedford in the last twelve months, from validation. Bedford decision record →

Public comments

2comments received
2 objecting

36 neighbours consulted · Last counted 22 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15208636
Planning Portal ref
PP-15208636
Neighbours
14 Sept 2026
Consultation
14 Sept 2026
Comments by
12 Oct 2026
Env. assessment
No
Bedford
Planning Authority Score
2.4/10
Poor
#253 of 296 overall
Relevant to this application:
Householder decisions

Bedford is slower than most councils at deciding householder applications: #201 of 296 on speed. 52% of applications have the time limit extended, above the 41% national average. Householder applications are slightly less likely to be approved here (86%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Bedford decision statistics
Based on MHCLG data, the year to March 2026
80%
Overall approval rate
Below avg (87%) #259 of 296
86%
Householder approved
Below avg (90%) #239 of 296
56%
Decided in 8 weeks
Below avg (63%) #201 of 296
52%
Extended time limit
Above avg (41%) #233 of 296
52%
Minor dwellings approved
109 decided (1-9 homes)
69%
Major dwellings approved
26 decided (10+ homes)
67%
Change of use approved
57 decided
993
Total decisions
203 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.