19 And 21 And 23 The Green Great Staughton Data via plota.co.uk

25/02456/FUL - Full Planning Application Approved

Proposal

Partial demolition of No. 19, demolition of existing rear garage and erection of a two-storey rear extension to Nos. 19 to 23 (Part Retrospective). Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
22 Dec 2025
✓
Validated
5 Jan 2026
✓
Consultation
10 Feb 2026
✓
Approved
29 May 2026

Approved on 29 May 2026 · Delegated · Last checked 7 Jul 2026

Site constraints 4

National infrastructure project about 645 m away: East Park Energy
The site is about 645 m from the project boundary. Generating station, examination closed, recommendation due.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
1 listed building within 150 m of the postcode pin; Inside the Great Staughton built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Huntingdonshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Application
Postcode
PE19 5DG
Received
22 Dec 2025
Validated
5 Jan 2026
Ward
Great Staughton
Parish
Great Staughton
Case officer
Show
Target decision
2 Mar 2026
Decision
Grant Permission to
Decision date
29 May 2026
Decision level
Delegated
Applicant
Show
Agent
TMV Architects

How this decision compares

Decided in 144 days from validation, 88 days slower than Huntingdonshire's median of 56 for demolitions. Approved, as 88% of demolitions here are.

55%decided within 8 weeks
88%approved
54decided in the last year

Plota live figures for demolitions decided by Huntingdonshire in the last twelve months, from validation. Huntingdonshire decision record →

Consultation & key dates

Alt. reference
PP-14565139
Planning Portal ref
PP-14565139
Neighbours
26 Jan 2026
Consultation
10 Feb 2026
Comments by
3 Mar 2026
Site or press notice
6 Feb 2026
Statutory expiry
2 Mar 2026
Env. assessment
No
Huntingdonshire
Planning Authority Score
3.9/10
Below average
#197 of 296 councils
Relevant to this application:
Householder decisions

Huntingdonshire is slower than most councils at deciding householder applications, ranking #210 out of 296. 55% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Huntingdonshire decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #155 of 296
95%
Householder approved
Above avg (90%) #80 of 296
55%
Decided in 8 weeks
Below avg (63%) #210 of 296
55%
Extended time limit
Above avg (41%) #250 of 296
69%
Minor dwellings approved
175 decided (1-9 homes)
91%
Major dwellings approved
22 decided (10+ homes)
87%
Change of use approved
52 decided
1,077
Total decisions
125 refused in the year to March 2026